Laserfiche WebLink
PA-1800074 (SA), S00011739 Page 3 of 3 <br /> 112 E. Taddei Rd., Acampo April 18, 2018 <br /> I. If 1,320 gallons or more of petroleum is to be stored aboveground then a Spill Prevention, <br /> Countermeasures and Control (SPCC) Plan is required. If any amount of petroleum is to <br /> be stored in a below grade vault, an SPCC plan is required. <br />