My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0011893
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TADDEI
>
112
>
2600 - Land Use Program
>
PA-1800074
>
SU0011893
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:35:30 AM
Creation date
9/9/2019 10:33:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0011893
PE
2631
FACILITY_NAME
PA-1800074
STREET_NUMBER
112
Direction
E
STREET_NAME
TADDEI
STREET_TYPE
RD
City
ACAMPO
Zip
95220-
APN
01313028, 01313027, 01313026
ENTERED_DATE
8/16/2018 12:00:00 AM
SITE_LOCATION
112 E TADDEI RD
RECEIVED_DATE
8/14/2018 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\TADDEI\112\PA-1800074\SU0011893\APPL.PDF \MIGRATIONS\T\TADDEI\112\PA-1800074\SU0011893\CDD OK.PDF \MIGRATIONS\T\TADDEI\112\PA-1800074\SU0011893\ED COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONDITIONS OF APPROVAL <br /> PA-1800074 <br /> LAWRENCE/VIAGGIO, INC. <br /> Site Approval Application No. PA-1800074 was approved by the Community Development Department <br /> on September 6,2018. The effective date of approval is September 16,2018. This approval will expire <br /> on March 17, 2020,which is 18 months from the effective date of approval, unless (1) all Conditions of <br /> Approval have been complied with, (2)all necessary building permits have been issued and remain in <br /> force, and(3)all necessary permits from other agencies have been issued and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT(Staff Contact: Megan Aguirre, [209]468-3144) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT'.The Site Plan <br /> required as a part of the building permit must be prepared by a registered civil engineer or licensed <br /> architect. This Plan must show drainage, driveway access details including gates, on-site.parking, <br /> landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE PLAN- <br /> CHECK LIST'for details). Foundation and soils investigation shall be conducted in conformance with <br /> Chapter 18 of the California Building Code at the time of permit application. A fee is required for the <br /> Site Plan review. (Development Title Section 9-884) <br /> b. APPROVED USE: This approval is for the expansion of an existing small winery to include the <br /> construction of a crush pad and a 6,500 square foot wine storage building with a dry lab as shown on <br /> the site plan dated July 19, 2018.(Use Type: Wineries and Wine Cellars—Winery) <br /> These conditions of approval are in addition to Use Permit application No. PA-0800266 and Site <br /> Approval application No. PA-0900200. <br /> c. PRODUCTION CAPACITY: A small winery shall have a minimum production capacity of more than <br /> two hundred one (201) gallons of wine and a maximum production capacity of thirty-six thousand <br /> (36,000)gallons of wine per year. (Development Title Section 9-1075..5[a]) <br /> d. TASTING ROOM: The maximum size of a stand alone wine tasting room or structure or area <br /> designated for wine tasting within a multipurpose building at an on-site wine cellar shall not exceed <br /> thirty percent (30%) of the area designated for production facilities or two thousand (2,000) square <br /> feet,whichever is greater. (Development Title Section 9-1075.5[n][1][A]) <br /> e. CAPITAL FACILITY FEE:This project may be subject to the Capital Facility Fee. If the Capital Facility <br /> Fee is applicable, the County shall collect the fees before the issuance of any building permits. <br /> (Development Title Section 9-1245.2) <br /> f. PROPERTY LINE SETBACKS: <br /> (1) Pursuant to Deviation application No. PA-1800188, the proposed wine storage building and <br /> related improvements shall beset back 200 feet from the eastern property line.(Development Title <br /> Section 9-824.2[a][21) <br /> (2) All other setbacks shall remain the same as those listed in Development Title Section 9-1075.5(c). <br /> PA-1800074 Conditions of Approval <br />
The URL can be used to link to this page
Your browser does not support the video tag.