Laserfiche WebLink
31SJCOG , Inc . <br /> S JC0G,Inc. <br /> San Joaquin County Multi-Species Habitat Conservation dr Open Space Plan <br /> 555 East Weber Avenue•Stockton,CA 95202 • (209)235-0600 • FAX(209)235-0438 <br /> SJMSCP HOLD <br /> -70 TO: Local Jurisdiction: Community Develooment Department Planning Department Building <br /> Department Engineering Department Survey Department Transportation Department <br /> Other: <br /> FROM: Laurel Boyd, SJCOG, Inc. <br /> DO NOT AUTHORIZE SITE DISTURBANCE <br /> DO NOT ISSUE A BUILDING PERMIT <br /> DO NOT ISSUE FOR THIS PROJECT <br /> The landowner/developer for this site has requested coverage pursuant to the San Joaquin County Multi- <br /> Species Habitat Conservation and Open Space Plan (SJMSCP). In accordance with that agreement,the <br /> Applicant has agreed to: <br /> 1) SJMSCP Incidental Take Minimization Measures and mitigation-requirement: <br /> 1. Incidental Take Minimization Measures(ITMMs)will be issued to the project and must be signed by the <br /> project applicant prior to any ground disturbance but no later than six(6)months from receipt of the ITM2vft. <br /> If ITNIIMs are not signed within six-months,the applicant must reapply for SJMSCP Coverage-Upon receipt <br /> of signed 1TNflvf&from project applicant,SJCOG,Inc.staff will sign the rIMMa. This is the effective date <br /> of the ITMMs. <br /> 2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs. <br /> _ 3. Upon issuance of fully executed ITMMs and prior to any ground disturbance,the project applicant must: <br /> a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage <br /> being covered(the bond should be valid for no longer than a 6 month period);or <br /> - b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered;or <br /> c. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> d. Purchase approved mitigation bank credits. <br /> 4. Within 6 months from the effective date of the ITMMs or issuance of a building permit,whichever occurs <br /> fust,the project applicant must: <br /> a. Pay the appropriate SJMSCP for the entirety of the project acreage being covered;or <br /> b. Dedicate land in-lieu of fees,either as conservation easements or fee title;or <br /> c. Purchase approved mitigation bank credits. <br /> Failure to satisfy the obligations of the mitigation fee shall subject the bond to be called. <br /> Project Title: PA-1800074(SA),PA-180D188(DV) <br /> Landonwer: Larry&Teri Lawrence Applicant: Viaggio, Inc. <br /> I Assessor Parcel#s: 013-130-26.-27.-28 <br /> !f <br /> T , R Section(s): <br /> f. <br /> Local Jurisdiction Contact: Megan Aguirre <br /> . The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate <br /> Incidental Take Minimization Measures are properly implemented and monitored and that <br /> appropriate fees are paid in compliance with the SJMSCP. <br />