Laserfiche WebLink
Thomas M. Gau <br /> COMMENTS ON DEVELOPMENTS <br /> SA-98-25 <br /> 2 . The driveway approach shall be improved in accordance with the <br /> requirements of San Joaquin County Standards R-17 prior to issuance of <br /> the occupancy permit . <br /> (Development Title Section 9-1145 . 5) <br /> 3 . The Traffic Impact Mitigation Fee will be required for this <br /> development . The fee is due and payable at the time of building <br /> permit application. (The fee currently is $143 .38 per additional <br /> daily trip-end generated in the Thornton area. The fee shall be <br /> automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News Record. ) <br /> (Resolutions R-90-304 , R-91-1025, R-93-167, R-94-179, R-95-650 and <br /> R-96-592) <br /> 4 . A copy of the Improvement Plan shall be submitted prior to release of <br /> building permit . <br /> GK:RWH:br <br /> i5-8ai,a a5 <br /> E: Manuel Lopez, Deputy Director/Development <br />