Laserfiche WebLink
':SOIL AND FOUNDATION ":ENGINEERING REPORT <br /> i <br />` ..BOKIDES TRUCKSTOP <br /> SAN JOAQUIN COUNTY, CALIFORNIA <br /> . .INTRODUCTION <br /> `This report presents the results of our soil`•and foundation <br /> engineering investigation for the proposed commercial develop- <br /> ment. Ths project will `consist of -.simgle story strucuture. The <br /> structure will -be supported by reinforced concrete continuous <br /> ,perimeter footings .and reinforced .concrete slab-on-grade. <br /> `The purpose of this investigation was to evaluate the foun- <br /> dation materials and sub`sur.face --conditions underlying the site <br /> 4 <br /> :and to provide conclusions and recommendations concerning the <br /> :soils engineering aspects of .the -project site. Suggested methods <br /> =of ..inspection and control are also discussed herein, <br /> Discussions of the field investigation, laboratory testing <br /> •program and recommended earthwork specifications for the proposed . <br /> -"Project are presented .in .Exhibits A and B , A .plot plan which <br /> outlines the property of this°subject report and shows the ex- <br /> ploratory pit locations is presented -on Drawing 1. <br /> SITE DESCRIPTION <br /> The proposed Bokides Truckstop islocated on 'Thornton Road j <br /> just south of Highway 12, in -San Zoaquin County, California. <br /> The proposed. site is approximately 1.. 65 acres. <br /> F: <br /> i <br /> I <br />