My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002217
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
14749
>
2600 - Land Use Program
>
UP-99-13
>
SU0002217
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 4:19:56 PM
Creation date
9/9/2019 10:35:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002217
PE
2626
FACILITY_NAME
UP-99-13
STREET_NUMBER
14749
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95240
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
14749 N THORNTON RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\T\THORNTON\14749\UP-99-13\SU0002217\APPL.PDF \MIGRATIONS\T\THORNTON\14749\UP-99-13\SU0002217\CDD OK.PDF \MIGRATIONS\T\THORNTON\14749\UP-99-13\SU0002217\EH COND.PDF \MIGRATIONS\T\THORNTON\14749\UP-99-13\SU0002217\EH PERM.PDF
标签
EHD - Public
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B-1 <br /> EXHIBIT B <br /> GUIDE FOR <br /> EARTHWORK SPECIFICATIONS <br /> 01. <br /> GENERAL <br /> Scone of work: These specifications and applicable plans pertain <br /> to and include all earthwork associated with the site rough - <br /> grading, including but not limited to the furnishing of all labor, <br /> tools, and equipment necessary for site clearing and grubbing, <br /> stripping, preparation of foundation materials for receiving fills <br /> excavation, processing, placement, and compaction of fill and <br /> backfill materials to the lines and grades shown on the project <br /> grading plans, and disposal of excess materials. <br /> Performance:. The Contractor shall be 'responsible for the satis- <br /> factory completion of all earthwork. in accordance with the project <br /> plans and specifications. This work shall be inspected and tested <br /> by a representative of D.L. Randall, Inc. , Testing Laboratory, <br /> hereinafter known as the Soils Engineer. -Attainment of design <br /> grades when achieved shall be certified to by the Civil Engineer. <br /> Both the Soils Engineer and the Civil Engineer are the Owner's <br /> representatives. If the Contractor should fail. to meet the <br /> technical or design requirements embodied in this document and on <br /> the applicable plans, he shall make the necessary readjustments <br /> until all work is deemed satisfactory as determined by both the <br /> Soils Engineer and the Civil Engineer. No deviation from these <br /> specifications shall be made except upon .written approval of the <br /> Soils Engineer or the Civil Engineer. <br /> No earthwork shall be performed without the physical presence or <br /> approval of the Soils Engineer. The Contractor shall notify the <br /> Soils Engineer at least two working days prior to the commencement <br /> of any aspect of the site earthwork. <br /> The Contractor agrees that he shall assume sole and complete <br /> responsibility for job site conditions during the course of con- <br /> struction of this project, including safety of all persons and <br /> property; that this requirement shall apply continuously and not <br /> be limited to normal working hours; and that the Contractor shall <br /> defend, indemnify and hold the Owner and the Engineers harmless <br /> from any and all liability, real or alleged, in connection with <br /> the performance of work on this project, except for liability <br /> arising from the sole negligence of the Owner or the Engineers. <br />
The URL can be used to link to this page
Your browser does not support the video tag.