Laserfiche WebLink
NEW UNDERGROUND STORAGE TANKS - PLAN ADDITION/CORRECTION SHEET <br /> The following checked and/or underlined items are to be addressed on plans : <br /> GENERAL <br /> A-11 . Provide the name and address of the facility. <br /> U� 2. Provide the name, address, and phone numbers of the contractor(s) , facility <br /> owner(s) , and operator(s). <br /> 3. Provide four complete sets of plans. (One to be retained by this office) . <br /> Include specification sheets, equipment brochures, monitoring, and response <br /> plans. <br /> 4. Provide plans to scale in nonerasable blueprint. <br /> CONSTRUCTION STANDARDS <br /> 1 . Location(s) and number of tanks. <br /> 2. Type of tank(s) to be installed. <br /> A. Steel clad .with fiberglass reinforced plastic. <br /> 1 . 35,000 to 40,000 volt Holiday Test required before "setting" tank(s) <br /> in ground. <br /> B. Fiberglass <br /> 1 . Striker plate dimensions and materials. <br /> 2. Striker plates under all accessible openings. <br /> C. Nonclad steel <br /> 1 . Cathodic protection provided (including nuts, bolts, washers, etc. ) . <br /> a. Approved by a corrosion engineer or NACE technician. <br /> b. Document stating inspection method and frequency (Minimum semi- <br /> annual inspection required) . <br /> Other types of tanks 0-L- L-A 1kus-e.o SuPEzTAoiIc <br /> 1 . Construction specification standards for durability. <br /> 3. Tank Capacity (List specific gallonage) . Io� o w <br /> 4. Contents to be stored in each tank (Be specific) . — unl-ec kJ -tsc��,,..e, +mJe-- <br /> A. Verification of product compatability with the tank(s), pipiX monitoring <br /> device(s) , epoxy or silicone glues , etc. <br /> 1 . List testing organization and approval . <br /> ,i m-12. �w v–e GcrN 6�w Q� e 2 <br /> 5. Provide manufacturers written installation instructions. (Include all piping, <br /> monitors , tanks, etc. <br /> Note - NFPA 30 Test required before covering tank and systems. NFPA 30 Test <br /> J��X iesF press�f� ,� is require on BOTH the Primary and Secondary containment systems. <br /> S jas1� Double walled tanks using pressure or vacuum testing to monitor annular <br /> �V,PP `�`� space are exempt from testing secondary container. <br /> r4rnu�,/ .lol a �( ✓u�C-= <br /> NFPA 329 "Precision Test" required upon completion of installations. <br /> One test result copy to be sent directly to this department from the <br /> y � 5 � testing company. <br /> VO Y\-CAIWw ✓j — A �A L 11Iuv10A-- o I— l ° O� u pPudV etQ �r�eQL � �J �' uS� lti.sr[�s�c4x <br /> R K- 4"t 4 <br />