Laserfiche WebLink
E. Piping Materials and Construction: <br /> UI <br /> Primary Containment C <br /> M a n u f acturer/Mode l A ,Q, Z> ,4 h <br /> --7 Secondary Containment <br /> ( (if applicable) Manufacturer/Model z�D-5 1-j -I.00 <br /> F. Type of product delivery system (i .e. , pressurized, 'suction) T-- <br /> tLJ�a�_cc��r� <br /> G. Piping eak detection/monitoring system: �-ok VId <br /> I_ Leak detector on pressurized line (for motor vehicle fuels only) <br /> o;- anufacturer3- <br /> I=vf Continuous monitoring device within the secondary containment, connected to an <br /> audible/visual alarm system. <br /> Manufacturer E'- <br /> (� Daily manual monitoring of the �---- <br /> J space between the primary and secowljry contain- <br /> ers using "dip stick" readings or visual determination;. <br /> Please specify <br /> —I Other --- <br /> 7 H. Describe the tank overfill protection system you plan to use. Check all that apply. <br /> Product level sensing device equipped with high level alarm and/or automatic <br /> shut off device. Specify type: <br /> I'9 Ball float valve on vent and vapor lines <br /> Other. Explain G <br /> I. Indicate type/manufacturer of vapor recovery system to be used: <br /> NOTE: Those systems with product flow thru the vapor lines during norilial operation <br /> require secondary containment of these lines. <br /> J. What is the approximate depth to ground water? <br /> Basis of determination <br /> OwiK. Attach a certification from the manufacturer, or his authorized representative, of the <br /> tank and piping materials as to the capability of the tank and piping materials to <br /> store the proposed hazardous substances. <br /> L. Attach three copies of Plans showing: <br /> _-I. Location of all existing and proposed structures 4--0^ <br /> 2. Location of all existing underground tanks andi in <br /> removed or abandoned) P P g (indicate if tanks are to he_ <br /> 3. Location of all proposed tanks and piping and their secondary containment <br /> 4. Cross section of tank and piping system including secondary containment, overfill <br /> Protection equipment, monitor ports and equipment, extension of all pipes illl <br /> ports to finish grade <br /> II-2 <br />