Laserfiche WebLink
Love's Travel Stops Final EIR - MITIGATION MONITORING/REPORTING PROGRAM <br /> Mitigation Measures Monitoring Monitoring Action Initial of Findings/ Rationale <br /> Phase Agency/Dept. Indicating Reviewing Significance <br /> Compliance Agency's After <br /> Pereonnet MlUgatlon <br /> TRANS 5.5-2: The middle site driveway shall have appropriate signage and pavement striping During Design San Joaquln Issuance of LS Draft EIR <br /> to adequately convey the proposed one-way enter driveway operation to all approaching Review and County Public Certificate of pp.5.22 <br /> vehicles. The County Public Works Department shall determine the adequacy of the Construction Works Occupancy through 5- <br /> design and approve the signage and pavement striping for the driveway prior to the Department 25 <br /> issuance of building permits. <br /> TRANS 5.53: The ODS shall coordinate with the County to minimize potential Inefficiencies of During Design San Joaquin Issuance of LS Draft EIR <br /> traffic Interactions between the Project site and Pilot Flying J's two truck driveways. Review and County Public Certificate of pp,5-22 <br /> Specifically,darification of the one-way entering operation at the Pilot Flying J's southern Construction Works Occupancy through 5- <br /> driveway and of the two-way operation at Pilot's northern driveway should be considered. Department 25 <br /> The County Public Works Departrment shall determine the adequacy of the design of and <br /> approve the signage and pavement striping for the northemmost driveway for the <br /> proposed Project prior to the issuance of building permits. <br /> TRANS 5.5-4: The ODS shall design and construct all Improvements associated with the During Deslgn San Joaquin Issuance of LS Draft EIR <br /> extension of North Thornton Road along and to the northern and of the Project site Review and County Public Certificate of pp.5.22 <br /> frontage. The ODS shall coordinate with the County Public Works Department to ensure Construction Works Occupancy through 5- <br /> that the design of improvements meets County road standards. Department 25 <br /> TRANS 5.61:The ODS shall provide on-slte pedestrian facilities,such as walkways and striped During Design San Joaquin Issuance of LS Draft EIR <br /> crosswalks, as required, to enhance pedestrian visibility to on-site motor vehicles, both Review and County Public Certificate of pp.5.25 - <br /> tacks and passenger cars. The location of pedestrian facilities shall be considered for,but Construction Works Occupancy through 5- <br /> - <br /> not limited to,the following locations:between the truck fuel dispensers and the store;and Department 26 <br /> the passenger car parking area and the store(across the drive-thru lane). <br /> TRANS 5.6-2: The ODS shall provide signage and pavement striping to direct and contain During Design San Joaquin issuance of LS Draft EIR <br /> vehicles destined for the drive-thru in order to avoid conflicts with the southernmost Review and County Public Certificate of pp,5-25 <br /> driveway. The County Public Works Department shall determine the adequacy of and Construction Works Occupancy through 5- <br /> approve the signage and pavement striping prior to installation. Department 26 <br /> TRANS 5.63:The ODS shall provide on-site signage to restrict the internal connection between During Design San Joaquin Issuance of LS Draft EIR <br /> the truck and the passenger car areas. Review and County Public Certificate of pp.5-25 <br /> Construction Works Occupancy through 5- <br /> Department 25 <br /> 127410/ST012R0851 63 November 30,2012 <br /> Love's Travel Slops Final EIR/MMRP <br />