Laserfiche WebLink
U.S.Department of Homeland Security <br /> FEMA Region IX <br /> 1111 Broadway,Suite 1200 <br /> Oakland,CA.946074052 <br /> eoMa FEMA <br /> �ANo SES' <br /> June 16, 2016 <br /> Megan E. Aguirre, Project Manager <br /> San Joaquin County, Community Development Department <br /> Development Services Division <br /> 1810 East Hazelton Avenue <br /> Stockton, California 95205 <br /> Dear Ms. Aguirre: <br /> This is-in response to your request for comments regarding Application Referral Application <br /> Number PA 1600118 (LA), Lot Line Adjustment application, (APN/Address: 025-110-16 & <br /> 17/17626 North Thornton Road, Lodi) (Supervisorial District 4). <br /> Please review the current effective countywide Flood Insurance Rate Maps (FIRMS) for the <br /> County of San Joaquin(Community Number 060299) and City of Lodi(Community Number <br /> 060300), Maps revised October 16,2009. Please note that the City of Lodi, San Joaquin County, <br /> California is a participant in the National Flood Insurance Program(NFIP). The minimum, basic <br /> NFIP floodplain management building requirements are described in Vol. 44 Code of Federal <br /> Regulations (44 CFR), Sections 59 through 65. <br /> A summary of these NFIP floodplain management building requirements are as follows: <br /> • All buildings constructed within a riverine floodplain, (i.e., Flood Zones A,AO, AH,AE, <br /> and Al through A30 as delineated on the FIRM),must be elevated so that the lowest <br /> floor is at or above the Base Flood Elevation level in accordance with the effective Flood <br /> Insurance Rate Map. <br /> • If the area of construction is located within a Regulatory Floodway as delineated on the <br /> FIRM, any development must not increase base flood elevation levels. The term <br /> development means any man-made change to improved or unimproved real estate, <br /> including but not limited to buildings, other structures, mining, dredging, filling, <br /> grading,paving, excavation or drilling operations, and storage of equipment or <br /> materials. A hydrologic and hydraulic analysis must be performed pYlor to the start of <br /> development, and must demonstrate that the development would not cause any rise in <br /> base flood levels. No rise is permitted within regulatory floodways. <br /> www.fema.gov <br />