Laserfiche WebLink
(� , Department of Public Works <br /> i s SAN / O A I I U I Nwif Kris Balaji,Director of Public Works <br /> COUNTY— Y Fritz Buchman,Deputy DirectonDevelopment <br /> Greatness grows 'here. Michael Selling,Deputy Dimcton'Engineedng <br /> -- working for YOU Jim Stone,Deputy DirectorlOperations <br /> Najee Zarif,Interim Business Administrator <br /> < July 21,2017 <br /> i <br /> MEMORANDUM <br /> TO: Mo Hatef, Senior Planner <br /> Community Development Department <br /> CONTACT PERSON: Giuseppe Sanfilippo <br /> I <br /> FROM: Alex Chetley,Engineering S(rvices Manager �. <br /> Development Services Division <br /> SUBJECT: PA-1700117;A Use Permit I pplication to expand an existing fire station by constructing a <br /> 1,350 square foot garage addition to the existing station building. This project is tied to <br /> Deviation application No.Pj1 700118; located on the southeast corner of North Thornton <br /> Road and Samoa Court,Th tion. (Supervisorial District 4) <br /> PROPERTY OWNER: Thornton Rural Fure District APPLICANT:Everen Watkins <br /> I <br /> ADDRESS: 25999 North Thornton RoadThornton APN: 001-160-29 <br /> INFORMATION: <br /> The site is not currently located within a;Federal Emergency Management Agency Designated Flood <br /> Hazard Area. <br /> Thornton Road has an existing and plan <br /> ped right-of-way width of 80 feet. <br /> This site is currently located within Coupty Service Area 12 which provides water and storm drainage <br /> services. <br /> I <br /> RECOMMENDATIONS: <br /> 1. The Traffic Impact Mitigation Fee shall be required for this application. The fee is due and payable <br /> at the time of building permit application. The fee will be based on the current schedule at the time <br /> of payment. The fee shall be automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News Record. (Resolutions R-00-433) <br /> I <br /> 2. The Regional Transportation Impact Fee shall be required for this application. The fee is due and <br /> payable at the time of building permit application. The fee will be based on the current schedule at <br /> the time of payment. (ResolutioR-06-38) <br /> 3. A copy of the Final Site Plan shlall be submitted prior to release of building permit. <br /> 1810 East Hazelton Avenue I Stockton, California 95205 1 T 209 468 3000 1 F 209 468 2999 <br />