Laserfiche WebLink
i <br /> Y <br /> 2.3 Test Chronology <br /> The plant was installed under the direction of the manufacturer on October 1, 1992 and dosing, <br /> at the rate of 450 gpd, was started on October 2, 1992. After three weeks of start-up, sampling <br /> was started on October 26, 1992. The stress test sequence was started on February 15, 1993 and <br /> ended on April 7, 1993. The evaluation was completed on May 6, 1993. Freezing of the diverter <br /> valve, requiring application of heat tape for a one week period (March 15 - 22, 1993), was the <br /> only maintenance required during the test. " <br /> 3.0 ANALYTICAL RESULTS <br /> 3.1 Summary <br /> Chemical analysis of samples collected during the evaluation were completed using the <br /> procedures in Standard Methods for: the Examination of Water and Wastewater3, or U.S. <br /> Environmental Protection Agency procedures4. Copies,': of the data generated during the <br /> evaluation are included in Appendix C. The results of the chemical analyses and on-site <br /> observations and measurements made during the evaluation are summarized in Table I. <br /> Guidelines for evaluating the analytical results from the testing are described in Section 5.1 and <br /> Section H of Appendix A in NSF Standard 40. In completing the pass/fail determination on the <br /> data generated from the testing, ten percent (a total of twelve) of"the samples collected during <br /> testing (not to exceed one sample during stress testing) can be excluded from the pass/fail <br /> calculations. During testing of the Clearwater Model CWW450, no sample days were excluded <br /> 'from the pass/fail determinations. <br /> Section 2.9 and Section E of Appendix A of the Standard define influent wastewater <br /> characteristics as it applies to testing under the Standard. Typical domestic wastewater is defined <br /> as having a BOD, concentration between 100 and 300 mg/L and a suspended solids concentration <br /> between 100 and 350 mg/L. By the Program Specific Policies for Wastewater Treatment Devices <br /> and Related Products and Components (dated January 1, 1991): <br /> When the influent Biochemical Oxygen Demand and/or Suspended Solids fall <br /> outside the ranges specified in Section 2.9 of Standard 40, the effluent samples for <br /> the two calendar days immediately following the occurrence may be excluded in <br /> the 7 and 30 sample averages. <br /> The Policy does not require exclusion of data following a day with influent concentrations <br /> outside the defined ranges, but allows for discard should the influent strength have an apparent <br /> impact on plant performance. There were four sample days when the influent strength fell <br /> outside the specified range, but none were determined to Nave an,impact on plant performance. <br /> '1 <br /> 4 " Draft Report <br />