Laserfiche WebLink
r5 <br /> IL ACCEPTANCE <br /> 1. The plant shall meet the applicable performance,requirements of Section 5 of this <br /> standard. <br /> 2. To evaluate the pass/fail criteria set forth in Section 5 of this Standard a minimum of 118 <br /> sample days (23 during stressing) shall be collected and analyzed. <br /> J <br /> 3. Due to the biological process, it is understood that aerobic systems.may_have_days_of <br /> -- upset. Therefore,for both Class I and Class H plants. 109'0 of the samples during testing <br /> (not to exceed one sample during stress testing) will not be included in the pass/fail <br /> determination. <br /> L REPORTS <br /> it - <br /> • The testing agency shall provide a report to the manufacturer that includes signific= <br /> data showing gest results for the plant, tested in accordance with this standard. <br /> Appropriate comments shall be provided All data shall be included in the report, along <br /> with the rationale for exclusion of any data due to adverse conditions during testing. <br /> i <br /> i <br /> r1 I# <br /> I { <br /> I <br /> R-6 <br />