Laserfiche WebLink
i <br /> j <br /> • jl <br /> ► 5.3 STRESS REQ : Measured values for BOD,and SS of eluent composite samples <br /> collected beginning 24 hours after completion of each stressing condition (48 hours after the <br /> power outage stress), as described in Appendix A.shall not exceed the applicable class effluent <br /> requirements in Item 5.1 and 5.2. <br /> 5.4 NOISE: Mechanical component parts shall beinstalled or protected so the noise produced does <br /> not exceed 60 dbA when measured 6.0 m (20 feet) frota the plant or appurtenances. <br /> 5:5- --MODIFICATION-OF-TEST M=- ODS: The-manufacturor-shall-follow-the tvicedures-in ---- <br /> A dix C to P <br /> ppea � request a modification of a specific test method A request for a modification of <br /> a test method may be needed due lata the following: <br /> • The design of the plant precludes effcave testing in accordance with the Standard. <br /> 9 <br /> • The manufact rer submits a design change to a previously tested plant that may not <br /> require full performance testing. <br /> X44 i <br /> 2 <br /> a i <br /> I <br /> a <br /> k <br /> !g I� k <br /> !J <br /> e }y <br /> 5i <br /> n �7 <br /> B-12 , <br />