Laserfiche WebLink
i <br /> D 3385 <br /> APPENDIX <br /> (Nonmandatory Information) . <br /> ` XI. DETERMINATION OF MOISTURE PATTERN tl <br /> 0.1 Although not considered a required pari of the test of the former position of the rings.Orient the trench so that the <br /> 1Rhod, the determination of the moisture pattern in the other wall is illuminated by the sun, if the day is sunny. If <br /> ioistened soil beneath the infiltration rings commonly pro- feasible,dig the trench large enough to include all of the newly <br /> les information useful in interpreting the movement of liquid moistened area. Collect samples from the shaded wall of the t <br /> .ough the soil profile. For example, horizontal liquid move- trench for determination of water content. If preferred, an `k <br /> lent may be caused by lower-permeability layers and will be auger, such as the orchard barrel type, may be used to <br /> 'entified by a lateral spreading of the wetted zone.Thus, the determine the approximate outline of the moistened area below '- <br /> ploration of the soil moisture pattern below an infiltration the rings and to collect samples for water content. <br /> `,It in an unfamiliar area may identify subsurface conditions <br /> hat may have affected the test and later applications of the X1.3 Plot the visibly moistened area on graph paper or on <br /> ta. the cross-section part of the report form(see Fig.4).If samples k, <br /> �XI.2 If the investigator wishes to make such a study,dig a were collected and water contents were determined, contours <br /> rench so that one wall of the trench passes along the center line of water content also can be plotted on the graph. <br /> q. <br /> The American Society for Testing and Materials takes no position respecting the validity or any patent rights asserted in connection ` . <br /> with any item mentioned in this standard users of this standard are expressly advised that determination of the validity of any such <br /> patent tights,and the risk of infringement of such rights,are entirely their own responsibility. <br /> This standard is subject to revision at any time by the responsible technical committee and must be reviewed every five years and , <br /> ` if not revised,either reapproved or withdrawn.Your comments are invitedeither forrevision of this standamor foradditional standards <br /> and should be addressed to ASTM Headquarters. Your comments will receive careful consideration at a meeting of the responsible <br /> technical commdtee,which you may attend.8 you feel that your comments have not received a fair hearing you should make your <br /> We"known to the ASTM Committee on Standards, 100 Barr Harbor Drive, West Conshohocken,PA 19428. _11 <br /> 3 <br /> 377 <br />