Laserfiche WebLink
Kerry Sullivan <br /> COMMUNITY DEVELOPMENT <br /> PA-04-59 (SA) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at <br /> the time of building permit application. (The fee currently is$168.96 per trip-end generated in the <br /> Stockton area. The fee shall be automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News Record.) (Resolutions 00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 5. Verification shall be obtained from the Solid Waste Division(468-3066)that this development has met <br /> the requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> NOTE: Any construction activity that results in the disturbance of at least one (1) acre of soil shall <br /> require a State NPDES construction permit. <br /> DTP:DG:ar <br /> PACOMMENTMSAWR 2004\PA-0400059.wpd <br />