Laserfiche WebLink
S = Sufficient <br /> I = Insufficient <br /> S / I 6.0 PERCOLATION TEST INFORMATION SECTION <br /> ®t/ 6.1 Site map showing the location, with concise and accurate dimensions of the percolation test holes on the parcel. <br /> ® t/ 6.2 The minimum number of shallow and deep percolation tests was performed for each parcel. <br /> 6.3 Description of the date, time and protocol used to prepare the test hole, including depth and dimensions of hole, <br /> preparation of hole, and depth of water used to presoak(minimum 12 inches). <br /> ®✓ 6.4 Description of the date, time and condition of the test hole after the 24-hour soak period(hole still intact, hole dry, <br /> / depth to water remaining in hole, etc.) <br /> ®V —❑ 6.5 The test conformed to SJC Policy EHD 02-02(correct depth, diameter, 2" gravel, 6" water refill, correct readings <br /> recorded). <br /> ®/ Q-- 6.6 Complete Percolation Test Form (including readings)was provided with REHS verification signature. The rate <br /> was correctly calculated using the last reading. <br /> ® ❑ 6.7 Discussion of any potential problems predicted and/or the need for an engineered or alternative septic system. <br /> ® ❑ 6.8 Discussion of percolation rates in relation to the type, size and location of future leach fields needed at the site. <br /> 7.0 CONCLUSION SECTION <br /> ®q� ❑ 7.1 The report was signed and stamped by the appropriately registered individual <br /> Reviewed By: Michael F. Escotto Reviewed Date: 11/6/2007 <br /> EHD 26-02-003 Page 2 of 3 Soil Suitability Checklist <br /> -r n�11-1 <br />