Laserfiche WebLink
Kerry Sullivan <br /> COMMENTS ON DEVELOPMENT <br /> PA-03-502 (SA) <br /> 4. The Water Supply Facilities Impact Mitigation Fee will be required for this development. The fee <br /> is due and payable prior to issuance of the building permit. (The fee currently is $528.00 per 1,000 <br /> gross square foot of building designated as Service Commercial. The fee shall be automatically <br /> increased on January 1 of each year through the year 2005 at the rate of 7.66 percent. A credit may <br /> be allowed if it can be verified that the existing development on this site was in operation on or <br /> after April 30, 1991.) <br /> (Development Title Section 9-818.4 and Resolutions R-91-327, R-94-185 and R-97-5) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division (468-3066)that this development has <br /> met the requirements of the Waste Plan Format for Development Projects. Final Site Plan is <br /> required upon submittal of verification. <br /> 7. All new structures or substantial improvements constructed on this parcel shall be elevated a <br /> minimum of one (1) foot above the 100-year flood elevation of twenty-seven (27) feet. <br /> DTP:DG:ar <br /> PACOMMENTS\SA\YR 2003\PA-0300502.doc <br />