Laserfiche WebLink
Berry Sullivan <br /> COMMUNITY DEVELOPMENT <br /> PA-03-484 (SA) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and <br /> payable at the time of building permit application. (The fee currently is $195.51 per additional daily <br /> trip-end generated in the Tracy area. The fee shall be automatically adjusted July 1 of each year <br /> by the Engineering Construction Cost Index as published by the Engineering News Record.) <br /> (Resolutions 00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 5. Verification shall be obtained from the Solid Waste Division (468-3066)that this development has <br /> met the requirements of the Waste Plan Format for Development Projects. Final Site Plan is <br /> required upon submittal of verification. <br /> NOTE: Any construction activity that results in the disturbance of at least one (1)acre of soil shall require <br /> a State NPDES construction permit. <br /> DTP:SH:ar <br /> PACONMENTS\SAWR 2003\PA-0300484. pd <br />