Laserfiche WebLink
K 6 <br /> -3- <br /> Community Development Department <br /> PA-1800207(SA) <br /> b. Applicant shall submit a"Storm Water Pollution prevention Plan"(SWPPP)to Public Works <br /> for review.A SWPPP preparation guide is available at the Department of Public Works.A <br /> copy of the approved SWPPP and all required records,updates,test results and inspection <br /> reports shall be maintained on the construction site and be available for review upon request. <br /> The post construction chapter of the SWPPP must identify expected pollutants and how they <br /> will be prevented from entering the storm system. The chapter shall also contain a <br /> maintenance plan,a spill plan, and a training plan for all employees on proper use,handling <br /> and disposal of potential pollutants.The example plans are available in the SWQCCP and <br /> CASQA handbooks. <br /> c. Permit Registration Documents(PRD's) shall be filed with the State Water Resources Control <br /> Board(SWRCB)to comply with the State"General Permit for Storm Water Discharges <br /> Associated with Construction Activity". The Waste Discharge Identification(WDID)Number <br /> issued by SWRCB shall be submitted to the Department of Public Works for the file. Contact <br /> SWRCB at(916)341-5537 for further information. Coverage under the SWRCB General <br /> Construction Permit Order 2009-0009-DWQ shall be maintained throughout the duration of all <br /> phases of the project. <br /> d. Owner shall be responsible for providing the County with an annual report of operation and <br /> maintenance of any system. The property owner shall also be responsible for the payment to <br /> the County of an annual system inspection fee established by the Resolution of the Board of <br /> Supervisors. <br /> e. A maintenance Plan shall be submitted and the execution of a Maintenance Agreement with <br /> San Joaquin County will be required for the owner/operator of the stormwater controls prior to <br /> the release into the site storm drainage design. <br /> f. Standard Best Management Practices for the type of development proposed shall be <br /> incorporated into the site storm drainage system. <br /> g. Wastewater shall not be allowed into the storm drainage system. <br /> Informational Notes: <br /> (i.) A Solid Waste Diversion Plan for all applicable projects must be submitted to the Building <br /> Division of the Community Development Department prior to issuance of the building permit. <br /> Contact the Solid Waste Division(468-3066)for information. <br /> (ii.) This property is subject to the requirements of San Joaquin County Mosquito&Vector Control <br /> District(209-982-4675)and the California Health and Safety Code for the prevention of <br /> mosquitoes.Best Management Practices(BMP)guidelines for stormwater devices,ponds and <br /> wetlands are available. <br /> AT: CH <br />