Laserfiche WebLink
GRANITE CONSTRUCTION COMPANY <br /> TRACY EXCAVATION EXPANSION <br /> PAGE 10 <br /> C. POST MINING TOPOGRAPHY <br /> 1. See B. 2. above. <br /> 2. See B. 2. above. <br /> 3. Post mining slopes will be sloped to 1 1/2:1 (horizontal to vertical) in accordance with the slope <br /> stability analysis performed by Kleinfelder, dated March 27, 1998 and enclosed behind Tab 3. <br /> The slopes will be planted with an annual grassland forb/grass mix in a tackified hydromulch <br /> application. <br /> E. DRAINAGE <br /> All drainage will be contained on site. <br /> F. DISPOSITION OF OLD EQUIPMENT <br /> All equipment and facilities will be removed from the site. <br /> G. REVEGETATION <br /> 1. Topsoils that exist on the site, approximately 64,000 cy, will be stripped with scrapers prior to mining and <br /> stockpiled within the set back areas and on the then unexcavated areas. These topsoils will be spread on <br /> the floor of the excavation prior to reseeding operations that occur during reclamation. <br /> J. FUTURE MINING <br /> There will be no future mining on the site after reclamation. <br />