<br /> Rute,.B=.,Landfills
<br /> 2.0 ApplicaDlllfy. All operational landfill silos,landfill closure activities,and activitica conducted at dosed landfill sites wnich di3turb surface soils
<br /> covering an area of more than one acre.
<br /> 5.1 Constructon of a landfill site. Requirements or uistr ct Rule 8020 and the California Cooe of Reguincns(CCR)Sections 176116
<br /> and 18222 apply.
<br /> 5.2 Adjacent public paved roads, Limit or promptly remove any accumulation of mud or dirt at the end of work day or once every 24
<br /> shoulders 8 accesses. hours. Recommend use of paved aprons,gravel strips,or wheel washers. The use of blower
<br /> devices for the removal of accumulations is prohibi iixl. The use of dry rotary brushes is prohibited,
<br /> except where preceded or accompanied by wetting to limit dust emissions.
<br /> 5.2.1 Interior roads of the landfill site. Landfill roads connected to off-site adiecpnt paved public roads must be paved for a sufficient
<br /> distance to allow mud and dirt accumul?tion to drop off. Sufficient Leaning of interior roads to limit
<br /> carry out onto the off-situ public roads. The use of blower devices for removal of accumulations is
<br /> prohibited. Use of dry rotary brushes is:prohibited,axcapt whan pracadod or accompanied by
<br /> sufficient wetting.
<br /> 5.4 Storage of consncUon vehicles, Rule 8070 applies.
<br /> equipment,and materials.
<br /> 6.1 Report of Disposal Site Information Keep a copy of RDSI at the landfill site or other site approved by Diso-ia,for inspection by authorized
<br /> I (RDSI). District employees upon request.
<br /> Rule 8060 Paved and unpaved Road
<br /> 2.0 Appticebdity: Any paved,or unpaved public or private road,street,highway,freeway,alley,way,access drive,access easement,or driveway
<br /> constructod or modified after December 10, 1993. Road construction and repair activities are subject to requirements set forth in Rule 8020.
<br /> Exemptions: Easements and roads providing access for not more than ten r¢3idenccs;paved roads less than three mites in length,and
<br /> 4.0 unpaved roads'.es5 than%mile in length;agricultural access roads;gated roads owned by a public agency,special di9triet,or public utility on
<br /> wnicn public access is prohibited;road maintenance and resurfacing activities,not including re--onstruction that add travel
<br /> lanes or traffic capacity:and roads wnlcn have been approved,or for which construction bids have been awarded,prior to December 10, 1903.
<br /> 5.1.1 New construction,modifications.or Comply with American Association of State Highway and Transportanon Officials(AASHTO)
<br /> approvals of paved roads with guidelines for the width of shoulders and median shoulderS. Addiflonal requirements,exemptions or
<br /> projected average daily vehicle trips of alternative compliance measures may apply.
<br /> 500 vehicles or more.
<br /> 5.2 Construction and use of new unpaved At least 50%of the length of the new unpaved road surface is controned by application of chemical
<br /> roads or road segments(except where dust suppressanUstabilizer,or the entire unpaved surface is controlled by application of water at least
<br /> natural moisture is sufficient to limit one time per week as necessary,or at least 25%of the length of the new unpaved road is paved to
<br /> VOE). provide a permanent stable Surface.
<br /> i
<br /> 6.1 Government Agencies with jurisdiction Require preparation and submittal of a written report to the SJVUAPCD documenting compliance
<br /> over publicly maintained paved roads with the provisions of this Rule. initial report prepared for the year 1994 and biennially thereafter.
<br /> open to public access. Additional requirements apply.
<br /> Rule 8070 Parking, Shipping, Receiving,Transfer,Fueling and Service Areas
<br /> 2.0 Applicability: All unpaved vehicle and/or equipment parking areas,fueling and service areas:and snipping,receiving,and transfer arras which
<br /> are of one acre or larger in size.
<br /> 3.0 Exemptions: Activibes described above which are conducted on sites less than one acre in size;agricultural activities,incluemg storage,
<br /> e.
<br /> maintenancand parking of agricultural eouipment associated with those activities;temporary areas used for timber harvesting activities:and
<br /> exposed surfaces of lake and river beds.
<br /> 4.1 On days the Brea is used(except Application of either water at least once daily,a chemical dust supCressant/stabilizer in accordance
<br /> where natural moisture is sufficient to with manufacturer's recommendations for road applications.or grave!to the entire surface.
<br /> limit VOE).
<br /> 4.2 , Public paved roads,shoulders,and Limit or promptly remove any accumulation of mud or dirt at the and of work day or once every 24
<br /> access ways adjacent to the site. hours. Recommend use of paved aprons,gravel strips,or wheel washers. The use of blower
<br /> devices for the removal of accumulations is prohibited. The use of dry rotary bn,shps is prohibited.
<br /> cx=pl where preceded or accompanied by wetting to limit dust emissions.
<br /> v
<br /> For additional information, please contact the Compliance Division of your nearest regional office;
<br /> Northern Region Central Region Southern Region
<br /> 4230 Kiernan Avenue, Suite 130 1990 East Gettysburg Ave. 2700 M Street, Suite 275
<br /> Modesto CA 95356-9321 Fresno CA 93726 Bakersfield CA 93301-2370
<br /> (209) 557-6400 (559)230-5950 (661) 326-6900
<br />
|