My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004097
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
32003
>
2600 - Land Use Program
>
PA-0200377
>
SU0004097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:30 AM
Creation date
9/9/2019 10:42:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004097
FACILITY_NAME
PA-0200377
STREET_NUMBER
32003
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
32003 S TRACY BLVD
RECEIVED_DATE
10/4/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\TRACY\32003\PA-0200377\SU0004097\APPL.PDF \MIGRATIONS\T\TRACY\32003\PA-0200377\SU0004097\CDD OK.PDF \MIGRATIONS\T\TRACY\32003\PA-0200377\SU0004097\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STAFF REPORT = Quarry Excavation <br /> Application Information <br /> Owner Richard Rose&Joseph Rose <br /> Applicant Granite Construction Company <br /> File Number. PA-02-377Sall, south of <br /> Location: On the northwest corner of Tracy Boulevard and Interstate <br /> Tracy <br /> Address: 32003&32023 Tracy Boulevard,Tracy <br /> OSIRC&AIG Community: None <br /> General Plan: AG-4O AM 253-090-70 & 1� <br /> Zoning: <br /> Project Size: 58.33 acres Parcel Size: 58.33 acres <br /> Water Supply: NIA Sewage Disposal: No Temporary <br /> 100-Year Flood: <br /> Storm Drainage: On-site Supervisorial District 5 <br /> Williamson Act No a Declaration <br /> Staff Jennifer Jolley CEQA Determination: Mitigated <br /> Proiect Descn'ption <br /> project is to expand an existing quarry and remove 3.4 million cubic yards of sand and gravel in four <br /> This es ears, The applicant anticipates that excavation will commence in <br /> phases over approximately seven ley site is located on <br /> 2005 and that the site will be completely reclaimed by the end of 2011. The excavation <br /> the south side of the California Aqueduct. The excavated materials will be processed by an existing <br /> nia <br /> processing facility, originally constructed for OX-89-1, which is located on the north side of the <br /> dCfrorrnrthe <br /> Aqueduct Grande Construction Company operates both sites. a Iconveyoor syystem hen QX-89-1 expanded <br /> Proved by the <br /> north side to the south side of the California Aqueduct (OX-99-1), y materials associated with <br /> Department of Water Resources to transport materials across the aqueduct FIx application also <br /> the latest expansion will be transported using the same system. The Quarry tion Plan text <br /> includes the Reclamation Plan maps dated August 16, 2002 and the Rose Property Reclamation <br /> dated April 2003. <br /> Recommendation <br /> Approval. This project is consistent with the General Plan and Board Order B-00-437, pertaining to the <br /> General Plan 2010 Review, adopted April 11, 2000. <br /> PA-02_3771Rose <br /> San Joaquin County Page 1 <br /> Community Development <br />
The URL can be used to link to this page
Your browser does not support the video tag.