Laserfiche WebLink
Conditions <br /> Quarry Excavation Application No. PA-02-377 was approved by the Planning Commission on <br /> The effective date of approval is - This approval will expire on ,which is 18 months from <br /> the date of approval, unless (1) all Conditions of Approval have been complied with, (2) all necessary <br /> building permits have been secured and remain in force, and (3) all necessary permits from other <br /> agencies have been secured and remain in force. <br /> Unless otherwise specked, all Conditions of Approval and ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT (Staff Contact Jennifer Jolley,468-3161) <br /> a. APPROVAL: This is an approval to remove 3.4 million cubic yards of sand and gravel in four (4) <br /> phases over approximately seven (7) years. The approval includes the Rose Property Reclamation <br /> Plan dated April 2003. All materials shall be processed on adjacent quarry site QX-89-1. The <br /> excavation process shall be completed by December 31, 2009. The site shall be fully reclaimed by <br /> December 31, 2011. <br /> b, STOCKPILING: No stockpiled soil or material shall be placed closer than twenty-five (25) feet to a <br /> property boundary. (Development Title Section 9-1415.3[b]) <br /> c. PRIVATE ROADS: All private roads involved in an excavation shall be maintained so as to control <br /> the creation of dust. The first one hundred (100) feet of any private road on the property that <br /> intersects with a publicly maintained road shall be surfaced in a manner approved by the Director. <br /> ired, at such <br /> nt <br /> and size ofothe e signs s ha be approved bly the Director of Public tWorks.o(Developmentns. The ntm <br /> TNe <br /> Section 9-1415.3[c]) <br /> thods <br /> d. EROSION CONTROL: Protective fh ti�ntrol of erosionanting, silt . An erosion and sedimeen dams, or other ent contra plan <br /> ved <br /> shall be required where necessary for <br /> approved by Development Services Division shall be part of the reclamation plan. (Development Title <br /> Section 9-1415.3[d]) <br /> e. PERFORMANCE STANDARDS: Standards contained in Chapter 9-1025 shall be met unless <br /> otherwise modified by conditions of the Quarry Excavation Permit. (Development Title Section 9- <br /> 1415.3[e]) <br /> f. HOURS OF OPERATION: Plant operations shall normally be carried on during the hours from 5:00 <br /> a.m. to 9:00 p.m. (Development Trde Section 9-1415.3[f]) <br /> g. REPLACEMENT OF TOPSOIL: The topsoil shall be set aside, and upon completion of an <br /> excavation, the topsoil shall be replaced and the site leveled in conformance with the excavation <br /> permit. (Development Title Section 9-1415.3[g]) <br /> erations <br /> all <br /> In, <br /> i/nstrucctiinstructionsfrom the Agricultural Commissioner oEED CONTROL: If noxious weeds are on f SanlJoaquin County. (Deveaccordance <br /> Title Section <br /> 9-1415.3[h]) <br /> PA-02-37TRose <br /> San Joaquin County Page 7 <br /> Community Development <br />