Laserfiche WebLink
exceed one (1) foot horizontal to one (1) foot vertical, except that temporary cut slopes at <br /> setback lines to a maximum of one half(ill)of a foot horizontal to one (1) foot vertical may be <br /> maintained if site-specific geologic and engineeringslopesanalysis <br /> hde demonstrate <br /> through <br /> slope <br /> stability analysis that the propose d temporary However, in the event that there are <br /> factor of safety as required in Section 9-1415.3(k)e(4. However, <br /> potential for structures re the <br /> existing structures on the adjacent property ( line than a fine <br /> adjacent property), the excavation shall at no time be closer to the to the toe oproperty <br /> slope. <br /> projected on a slope of one(1)to one(1)from the property line <br /> (5) Final Slopes. Final cut and/or fill slopes shall not exceed two (2) feet horizontal to one (1) foot <br /> vertical,except as specified below. <br /> A. Final slopes to a maximum of one and one-half(1 1/2)feet horizontal to one (1)foot vertical <br /> may be maintained when site-specific geologic and engineering analysis demonstrate <br /> through a slope stability analysis that the proposed final slopes <br /> while demonstrating sm slo� <br /> stability factor of safety as required in Section 9-1415.2(k)(4), <br /> for the proposed end use and protecting against erosion (by means of revegetation or other <br /> methods approved by Development Services Division). <br /> L (6) Fill Slopes. Fill slopes shall be constructed consistent with recommendations from a qualified <br /> civil/geotechnical engineer based upon site-specific geologic conditions. <br /> I. FENCING: Fencing four(4)feet in height consisting of not less than three(3)strands of barbed wire, <br /> or an approved equivalent, shall be placed around the excavation area where <br /> h selopesfentperthan <br /> oran <br /> two (2)feet horizontal to one(1)foot vertical are maintained. Six (6)foot high <br /> horizontal fencing <br /> ci one an <br /> approved equivalent shall be required where slopes steeper than two (2) <br /> foot vertical are created, if the Proximity of such slopes to residential uses or other uses involving a <br /> concentration of people so warrants. (Development Title Section 9-1415.3[1]) <br /> m. SCREENING AND LANDSCAPING: Screening consistent with Chapter 9-1020 is required. <br /> (Development Title Section 9-1415.3[m)) <br /> (1) A minimum ten (10)footwide planting strip is required along 1-580. The planting of oleanders or <br /> other evergreen trees as Proposed on the Site Plan is adequate. <br /> n. EXCAVATIONIRECLAMATION SCHEDULE: The reclamation plan shall shono i four start <br /> of excavation. Reclamation on one phase of an excavation shall be initiated p <br /> next excavation phase. The final reclamation of any phase of excavation shall be completed within <br /> so that at <br /> two years of the commencement of the reclamation process. Excavation hose beinshall be g xcavated- <br /> any point of time a maximum of one phase is being reclaimed while one p 9 <br /> (Development Title Section 9-1415.3[o)) <br /> s the excavation <br /> o. TIME ues in compliance <br /> The Quarry ExcaovveddPPermit <br /> r mitt Theshall <br /> excavation processlong <br /> shallabe completed by <br /> continues in compliance with the app <br /> December 31,2009. (Development Title Section 9-1415.3[p)) <br /> p. ANNUAL INSPECTION REPORTS: Annual inspections of the excavation shall be conducted by the <br /> County to ensure compliance with the conditions of the permit and the reclamation plan. The County <br /> may use professional services as provided for in Section 9-240.11. The consultant son hall <br /> be ss <br /> elected <br /> by San Joaquin County. Upon completion of the annual inspection, the peall <br /> e of the <br /> mining operation shall submit to the <br /> at 22e foist and <br /> the County Resources M which <br /> The shall co ainlhe <br /> the information required by Sec cost <br /> of <br /> inspection shall be <br /> paid by the mine operator. Additional inspections may be conducted, but the <br /> PA-02-377\Rose <br /> San Joaquin County Page 9 <br /> Community Development <br />