My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0008068
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRETHEWAY
>
22275
>
2600 - Land Use Program
>
PA-0900260
>
SU0008068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:33:20 AM
Creation date
9/9/2019 10:44:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0008068
PE
2631
FACILITY_NAME
PA-0900260
STREET_NUMBER
22275
Direction
N
STREET_NAME
TRETHEWAY
STREET_TYPE
RD
City
ACAMPO
APN
01726044
ENTERED_DATE
1/25/2010 12:00:00 AM
SITE_LOCATION
22275 N TRETHEWAY RD
RECEIVED_DATE
1/25/2010 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\TRETHEWAY\22275\PA-0900260\SU0008068\APPL.PDF \MIGRATIONS\T\TRETHEWAY\22275\PA-0900260\SU0008068\CDD OK.PDF \MIGRATIONS\T\TRETHEWAY\22275\PA-0900260\SU0008068\EH COND.PDF \MIGRATIONS\T\TRETHEWAY\22275\PA-0900260\SU0008068\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rick Griffin , <br /> COMMUNITY DEVELOPMENT <br /> PA-0900260 (SA) <br /> 2. The driveway approaches shall be improved in accordance with the requirements of San Joaquin County <br /> Standards R-17 prior to issuance of the occupancy permit. (Development Title Section 9-1145.5) <br /> 3. The owner shall execute an Irrevocable Offer and Agreement to Dedicate Road to result in a twenty five <br /> (25)foot wide right-of-way from the centerline of Tretheway Road to the property line across the parcel's <br /> frontage. (A $706.00 fee currently is required for processing per Development Title Table 9-240.2 in <br /> addition to a copy of the Grant Deed and a legal description of the parcel to be offered for dedication.) <br /> (The fees due will be based on the current fee schedule.) (Development Title Section 9-1150.5) <br /> 4. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of buildingpermit application. The <br /> p pp fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record. (Resolution R-00-433) <br /> 5. The Regional Transportation Impact Fee shall be required for this development. The fee is due and payable at <br /> the time of building permit application. The fee is based on the current schedule. (Resolution R-06-38) <br /> 6. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 7. Verification shall be obtained from the Solid Waste Division (468-3066) that this development has met the <br /> requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon submittal <br /> of verification. <br /> 8. The developer shall provide drainage facilities and meet the requirements of San Joaquin County <br /> Development Standards to prevent the increased runoff release rate of storm water from discharging onto <br /> other properties and to prevent offsite sediment transport. Retention basins shall be fenced with six(6)foot <br /> high chain link fence or equal when the maximum design depth is 18 inches or more. Required retention basin <br /> capacity shall be calculated by a registered civil engineer, licensed contractor or licensed architect prior to <br /> release of Building Permit. (Development Title Section 9-1135) - <br /> 9. The proposed project shall follow the practices in the County"Small Site Stormwater Management Plan." <br /> Informational Notes: <br /> (i.) This property is subject to the requirements of San Joaquin County Mosquito&Vector Control District(209- <br /> 982-4675)and the California Health and Safety Code for the prevention of mosquitoes. Best Management <br /> Practices (BMP)guidelines for stormwater devices,ponds and wetlands are available. <br /> (ii.) All future building permits for projects located within a Special Flood Hazard Area at the time of permit <br /> issuance shall meet the San Joaquin County flood hazard reduction requirements(Title 9, Chapter 9-1605) <br /> and all requirements of the State of California(CCR Title 23)that are in force at the time of permit issuance. <br /> As an example,these requirements may include raising the finish floor elevation one foot above the expected <br /> flood level and/or using flood resistant materials. . <br /> BD: <br /> \\PwsrvfpOl lshareslDevServiceslDPubServICOMMENTSISAIYR 20091PA-0900260TA-0900260.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.