My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0001177
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TULLY
>
19618
>
2600 - Land Use Program
>
LA-01-19
>
SU0001177
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:28:29 AM
Creation date
9/9/2019 10:45:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0001177
PE
2690
FACILITY_NAME
LA-01-19
STREET_NUMBER
19618
Direction
N
STREET_NAME
TULLY
STREET_TYPE
RD
City
LOCKEFORD
ENTERED_DATE
10/17/2001 12:00:00 AM
SITE_LOCATION
19618 N TULLY RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\TULLY\19618\LA-01-19\SU0001177\APPL.PDF \MIGRATIONS\T\TULLY\19618\LA-01-19\SU0001177\CDD OK.PDF \MIGRATIONS\T\TULLY\19618\LA-01-19\SU0001177\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�s �I <br /> E4 <br /> E� CONDITIONS OF APPROVAL <br /> LA-01-19 <br /> Pentecostal Church of God <br /> �! 'F Lot Line Adjustment Application No.LA-01-19 was a <br /> i pproved by the San Joaquin County Community <br /> Development Department on April 17,2001,which is the effective date of approval. <br /> E1 <br /> f ; Unless otherwise specified,all Ordinance requirements shall be complied with prior to approval of a <br /> Notice of Lot Line Adjustment. <br /> E� d <br /> E This approval will expire on October 17, 2002, which is 18 months from the effective date of <br /> approval, unless.a Notice of Lot Line Adjustment has been filed with and acts <br /> E 3 Surveyor. pted by the County <br /> !+ 1. <br /> COM MUNITYDEVELOP MENTDEPARTMENT (Staff Contact: Leanne Mueller,468-3228) <br /> k <br /> `r a. APPROVAL: The Lot Line Adjustment recorded shall substantially conform to the Tentative Map <br /> El dated March 14,2001. <br /> b. NOTICE OF LOT LINE ADJUSTMENT. A"Notice of Lot Line Adjustment"shall be recordedriot <br /> li ( conveyance of property through deeds by the owner. Legal descriptions of the lands to be p to <br /> I a exchanged shall be submittedto the Surveyor's Division for review and forwarding to the Community <br /> Ej Development Department. The legal descriptions shall be prepared,stamped,and signed by a <br />' Registered Civil Engineer,qualified to practice Land Surveying per Section 8731 of the Land <br /> Surveyors'Act, or a Licensed Land Surveyor. <br /> 1 <br /> Note: A Lot Line Adjustment does not change the zoning or General Plan designations of the <br /> parcels involved. All uses shall complywith the zoning and General Plan designationsof the parcels <br /> is on which they are located. <br /> j 2. DEPARTMENT OF PUBLIC WORKS (Seethe attached memo dated April 3,2001.) <br /> li 'k i <br /> i <br /> i <br /> i` <br /> I E <br /> q <br /> s <br /> I E. <br /> E! <br /> II <br /> k <br /> `i <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.