My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002683
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TULLY
>
5320
>
2600 - Land Use Program
>
SA-99-55
>
SU0002683
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:24 AM
Creation date
9/9/2019 10:46:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002683
PE
2633
FACILITY_NAME
SA-99-55
STREET_NUMBER
5320
Direction
N
STREET_NAME
TULLY
STREET_TYPE
RD
City
LINDEN
ENTERED_DATE
10/31/2001 12:00:00 AM
SITE_LOCATION
5320 N TULLY RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\TULLY\5320\SA-99-55\SU0002683\APPL.PDF \MIGRATIONS\T\TULLY\5320\SA-99-55\SU0002683\CDD OK.PDF \MIGRATIONS\T\TULLY\5320\SA-99-55\SU0002683\EH COND.PDF \MIGRATIONS\T\TULLY\5320\SA-99-55\SU0002683\MISC.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONDITIONS OF APPROVAL <br /> SA-99-55 <br /> Bafico <br /> Site Approval Application No. SA-99-55 was a <br /> Development Department on August 3, 1999. The effective date of a <br /> approved by the San Joaquin County Community <br /> approval will expire on February 11, 2001, which is 18 months from the effective date of approval, <br /> approval is August 13, 1999. This <br /> unless (1) all Conditions of Approval have been complied with, (2) all necessary building permits <br /> have been secured and remain in force, and (3) all necessaryes <br /> been secured and remain in force. permits from other agencies have <br /> Unless otherwise specified,all Conditions of Approval and Ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as Ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other Ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT (Staff Contact: Jeff Fisher, 468-9653) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT." The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainage, driveway access details (including gates), on- <br /> site parking, landscaping, signs, existing and proposed utility services, and grading (refer to the <br /> "SITE PLAN CHECK LIST" for details). A fee is required for the Site Plan review. (Development <br /> Title Section 9-884) <br /> b. APPROVED USE: This approval is for a 130-foot-high lattice cellular communications tower and <br /> two equipment cabinets as shown on the Site Plan submitted July 1, 1999. <br /> c. SETBACKS: The structure shall comply with the following setback requirements: <br /> (1) The proposed tower and accompanying equipment shall be set back a minimum of thirty (30) <br /> feet from the front property line, a minimum of ten (10) feet from the side property lines; and a <br /> minimum of fifteen (15) feet from the rear property line. (Development Title Section Table 9- <br /> 610.2) <br /> (2) New freestanding support structures shall be located a distance equal to at least the height of <br /> the said structure from residential structures on adjoining properties. (Development Title Section <br /> 9-1065.4[d]) <br /> d. MAINTENENCE OF FACILITIES: All freestanding structures, antennas, and supporting <br /> equipment associated with wireless telecommunication shall be maintained in good condition by <br /> the provider of the telecommunication facility and, whenever necessary, repaired or replaced. <br /> (Development Title Section 9-1065.7) <br /> e. REMOVAL OF FACILITIES: Freestanding structures, antennas, and supporting equipment <br /> associated with wireless telecommunication shall be removed by the provider of such facilities <br /> and the site restored to its pre-construction state if said facilities have not been operational or <br /> used for a period of six (6) consecutive months. Removal and site restoration shall be completed <br /> within ninety (90) days of the end of said six (6) month period. To guarantee removal of unused <br /> or abandoned facilities, the Review Authority may require the applicant to post a bond or other <br /> suitable security instrument. (Development Title Section 9-1065.8) <br /> SA-99-55 <br /> Conditions of Approval 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.