Laserfiche WebLink
August 3, 2004 <br /> NOA Project Number: E04081A <br /> 6.2 Boring Preparation and Specifications <br /> One shallow soil boring was advanced on the Site to a depth of 3.06 feet by hand auguring on <br /> July 20, 2004. <br /> A 1.5-inch diameter PVC pipe with perforations on the bottom was used to measure the drop <br /> of water in the percolation test boring. Approximately 2 inches of "pea gravel" were placed in <br /> the bottom of the open soil boring, then the PVC pipe was installed on top of the gravel. <br /> Several feet of "pea gravel" were backfilled in the annular space. <br /> 6.3 Presaturation of Borings <br /> Presaturation of the percolation test hole occurred on July 21, 200. The depth of water used <br /> to pre-soak was 12 inches above the bottom of the boring. After the 24-hour soak period, the <br /> presaturated hole was found to be intact and dry onjuly 22, 2004. <br /> i <br /> 6.4 Percolation Test Procedure and Results <br /> A percolation test was conducted for the boring on July 22, 2004 in accordance with the <br /> requirements of the EHD. A percolation test with duration of one hour was performed. The <br /> entire one-hour-ercolation test was observed by Ms. Linda Turkatte, Environmental Health <br /> v. <br /> Inspector, EHD. <br /> Measurement of the water level during the percolation test was from a fixed reference point <br /> on the PVC casing using an electric well sounder with an depth accuracy of 1/100th foot. All <br /> tabulated values on the field data sheet (appendix) are in decimal feet. After water drop was <br /> observed, the holes were checked for refill. The refill level was approximately 0.5 ft (6 inches) <br /> of water above the bottom level of the percolation test hole. The readings were taken <br /> _ approximately every 10 minutes for a period of one hour. <br /> A shallow percolation test is defined by the EHD as being between 36 and 42 inches in depth. <br /> A satisfactory percolation rate for a shallow test is less than or equal to 60 minutes per inch <br /> drop. One percolation test must demonstrate a satisfactory percolation rate within the <br /> proposed septic system disposal field. Details of the percolation test are summarized in Table <br /> 6. <br /> 10 <br />