Laserfiche WebLink
(3) A minimum of 4 parking spaces shall be provided, including 1 accessible space (2.5 spaces are <br /> required for every 1,000 feet of building area). (Development Title Section 9-1015.3) <br /> (4) A total of eighty-three (83) parking spaces. (1 space is required for every 3 attendees) shall be <br /> provided for marketing events, including an additional three (3) accessible spaces of which one <br /> shall be van accessible. The previously paved parking spaces may be used to satisfy C.C.R. <br /> Title 24 requirements. The accessible spaces shall be located as close as possible to the <br /> primary entrance(C.C.R., Title 24). <br /> g. Provide restrooms conforming with all disabled access requirements. (CCR, Title 24) <br /> h. Building No. 1 will be a change in occupancy classification and consequently shall be brought into <br /> compliance with current codes, including handicapped access. <br /> i. ACCESS AND CIRCULATION: The following requirements apply and shall be shown on the Site <br /> Plan: <br /> (1) Access driveways shall have a width of no less than twenty-five (25) feet for two-way aisles and <br /> sixteen (16) feet for one-way aisles, except that in no case shall driveways designated as fire <br /> department access be less than twenty(20) feet wide(Development Title Section 9-1015.4jhl). <br /> 2. DEPARTMENT OF PUBLIC WORKS (Staff Contact: Gabe Karam, 468-3000) <br /> a. An encroachment permit shall be required for work within the road right-of-way. (Development Title <br /> Section 9-1145.4) <br /> b. The driveway approach shall be improved in accordance with the requirements of San Joaquin <br /> County Standard R-17 prior to issuance of the occupancy permit. (Development T-rtie Section 9- <br /> 1145.5) <br /> c. No vehicles shall be parked on the County right-of-way during a marketing or special event. <br /> d. The Traffic Impact Mitigation Fee will may be required for this development. The fee is due and <br /> payable at the time of building permit application. The fee currently is $148-02 $164.00 per <br /> additional daily trip-end generated in the Lodi area. The fee shall be automatically adjusted July 1 of <br /> each year by the Engineering Construction Cost Index as published by the Engineering News <br /> Record. A Gredit may be alIGwed Of it Gan be verified that a b6lSiRess was in opeF2tiOR GR the site <br /> SinGe ApFil 23, 1999. (Reso1UtiGRsR 99 394, R 91 1025, R 93 167, R 95 650, and R 96 592) <br /> (Resolution 00-433) <br /> e. A copy of the lmpreuement Final Site Plan shall be submitted prior to release of building <br /> permits. <br /> f. Verification shall be obtained from the Solid Waste Division (468-3066) that this development has <br /> met the requirements of the Waste Plan Format for Development Projects. The Final Site Plan is <br /> required upon submittal of verification. <br /> 3. PUBLIC HEALTH SERVICES(Staff Contact: Ted Norgard, 468-3443) <br /> a. Construction of an individual sewage disposal system under permit and inspection by the <br /> Environmental Health Division is required at the time of development (Development Title Sections 9- <br /> 110.3 and 9-110.4), or provide evidence to this Department that the existing office septic system <br /> meets Environmental Health Division capacity and construction standards for this use. <br /> San Joaquin County UP-98-3\Spenker Ranch <br /> Community Development Page 7 <br />