My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002230
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
1973
>
2600 - Land Use Program
>
UP-98-03
>
SU0002230
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:07 AM
Creation date
9/9/2019 10:46:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002230
PE
2626
FACILITY_NAME
UP-98-03
STREET_NUMBER
1973
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95240
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
1973 W TURNER RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\TURNER\1973\UP-98-03\SU0002230\APPL.PDF \MIGRATIONS\T\TURNER\1973\UP-98-03\SU0002230\CDD OK.PDF \MIGRATIONS\T\TURNER\1973\UP-98-03\SU0002230\EH COND.PDF \MIGRATIONS\T\TURNER\1973\UP-98-03\SU0002230\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE DISCHARGE REQUHt wAENTS ORDER NO.R5-2004-0079 2 <br /> SPENKER RANCH,INC. <br /> JESSIE'S GROVE WINERY <br /> SAN JOAQUIN COUNTY <br /> 7. Because process wastewater monitoring data for the Discharger's winery is not yet available, the <br /> RWD provides typical winery wastewater data based on a published reference. These values are <br /> presented below; however, it is noted that other area wineries typically produce wastewater with <br /> higher constituent concentrations. <br /> Compound Units Concentration Range' <br /> Biochemical Oxygen Demand (BOD5)2 mg/L 3,000— 7,000 <br /> Suspended Solids mg/L 200- 800 <br /> Settleable Solids mg/L 5 - 20 <br /> pH Std. Units 3 — 5 <br /> Dissolved Oxygen mg/L 0- 9 <br /> Total Nitrogen mg/L 5 - 50 <br /> Total Phosphorus mg/L 2 - 8 <br /> Grease mg/L 5 - 40 <br /> Sulfate mg/L 20- 75 <br /> Total Dissolved Solids mg/L 500 - 1,000 <br /> Inorganic Dissolved Solids mg/L 300- 700 <br /> Volatile Dissolved Solids mg/L 200- 700 <br /> I Typical chemical analyses of winery wastewater from Fall Creek Engineering, Report of Waste <br /> Discharge,February 2004. <br /> 2 Five-day,20°Celsius Biochemical Oxygen Demand <br /> WASTEWATER SYSTEM <br /> 8. Wastewater from winery processes such as tank cleaning, grape crushing, barrel washing, and <br /> equipment/floor cleaning will be screened to separate wastewater solids, settled, collected in a <br /> 1,000 gallon septic tank, automatically pumped into a water truck, and then manually applied to a <br /> 70 acre land application area. The Discharger has purchased, but has not yet installed, a <br /> wastewater screen. The wastewater treatment schematic is presented on Attachment B, which is <br /> attached hereto and made part of this Order by reference. <br /> 9. Stormwater that falls on paved areas and roofs within the winery facility is currently collected and <br /> discharged into the wastewater system. The Discharger has proposed installation of a diversion <br /> valve to allow stormwater to be diverted to the stormwater retention pond. Such an arrangement <br /> requires additional monitoring of stormwater and may prevent the Discharger from operating <br /> during precipitation events that exceed the wastewater system handling capacity. Wastewater/ <br /> stormwater mixtures are classified as wastewater. <br /> 10. A mobile, contract wine bottling service will perform bottling. The bottles arrive at the site already <br /> cleaned, and no rinsing occurs prior to filling. Therefore, bottling activities will not generate a <br /> high strength waste stream. <br /> 11. Based on a hydraulic-analysis, the 70 acre land application area has adequate capacity to accept all <br /> wastewater and rainfall (using the 100-year return annual precipitation total). Staff estimates at a <br /> wastewater flow rate of 3,500 gallons per day(gpd) the wastewater discharge is less than 1-percent <br />
The URL can be used to link to this page
Your browser does not support the video tag.