My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002230
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
1973
>
2600 - Land Use Program
>
UP-98-03
>
SU0002230
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:07 AM
Creation date
9/9/2019 10:46:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002230
PE
2626
FACILITY_NAME
UP-98-03
STREET_NUMBER
1973
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95240
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
1973 W TURNER RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\TURNER\1973\UP-98-03\SU0002230\APPL.PDF \MIGRATIONS\T\TURNER\1973\UP-98-03\SU0002230\CDD OK.PDF \MIGRATIONS\T\TURNER\1973\UP-98-03\SU0002230\EH COND.PDF \MIGRATIONS\T\TURNER\1973\UP-98-03\SU0002230\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE DISCHARGE REQUIRInv1ENTS ORDER NO.R5-2004-0079 "' 12 <br /> SPENKER RANCH,INC. <br /> JESSIE'S GROVE WINERY <br /> SAN JOAQUIN COUNTY <br /> b. By 2 September 2004, the Discharger shall submit a Wastewater Treatment System <br /> Construction Report and Land Application Area Improvement Report that describes <br /> the installation of the wastewater screen, improvements made to the 70 acre land <br /> application area, and installation of a stormwater diversion valve to comply with the <br /> requirements of this Order. <br /> c. By 2 September 2004, the Discharger shall submit and implement an Operation and <br /> Management Plan (O&MPlan) that addresses operation of the wastewater treatment <br /> and disposal facility. At a minimum, the O&M Plan will describe (a) the daily <br /> operation and maintenance of the treatment system, (b) the practices used to treat the <br /> wastewater within limits specified in this Order, (c) the locations of the land <br /> application area, and procedures to prevent excessive BOD, nitrogen, or dissolved <br /> solids loading of the land application area, (d) the locations of flow and effluent <br /> sampling points, (e) quality control sampling procedures necessary to obtain <br /> representative samples, (f)practices used to maintain the land application area, (g) the <br /> locations of the solid waste disposal areas, methods of disposal, and the daily practices <br /> associated with the disposal of the solid waste, (h) exactly how the wastewater will be <br /> applied by truck such that it will be applied evenly to the entire 70 acre disposal area, <br /> and (i) how the 70 acres has been made ready to accept the wastewater(i.e., <br /> installation of fencing or notification signs, installation of berms to prevent runoff, <br /> reconfiguration of checks to improve application rates). A copy of the O&M Plan <br /> shall be kept at the facility for reference by operating personnel and they shall be <br /> familiar with its contents. <br /> d. At least 30 days before the Discharger wishes to apply wastewater to any new land <br /> application area(s), the Discharger shall submit a report describing completion of <br /> improvements to the proposed land application areas to ensure compliance with this <br /> order. The improvements shall include, but not be limited to, installation of fencing or <br /> notification signs, installation of berms to prevent surface water runoff in land <br /> application areas, reconfiguration of checks to improve application rate, and <br /> installation of groundwater monitoring wells. <br /> e. By 1 December 2004, the Discharger shall submit a Groundwater Well Installation <br /> Report of Results consistent with the guidelines presented in Attachment C. <br /> f. By 31 January 2005, the Discharger shall submit and implement a workplan for a <br /> Salinity Reduction Study. The study shall look at all aspects of winery waste and shall <br /> investigate methods to reduce the concentration of dissolved solids in the wastewater. <br /> At a minimum, the salinity reduction report shall include a discussion of the <br /> winemaking chemicals, cleaning and sterilization procedures, vineyard practices, and <br /> salinity monitoring. <br /> g. By 30 March 2006, the Discharger shall submit a Background Groundwater Quality <br /> Study Report. For each groundwater monitoring parameter/constituent identified in the <br /> MRP, the report shall present a summary of monitoring data, calculation of the <br /> concentration in background monitoring wells, and a comparison of background <br /> groundwater quality to that in wells used to monitor the land application area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.