My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002230
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
1973
>
2600 - Land Use Program
>
UP-98-03
>
SU0002230
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:07 AM
Creation date
9/9/2019 10:46:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002230
PE
2626
FACILITY_NAME
UP-98-03
STREET_NUMBER
1973
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95240
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
1973 W TURNER RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\TURNER\1973\UP-98-03\SU0002230\APPL.PDF \MIGRATIONS\T\TURNER\1973\UP-98-03\SU0002230\CDD OK.PDF \MIGRATIONS\T\TURNER\1973\UP-98-03\SU0002230\EH COND.PDF \MIGRATIONS\T\TURNER\1973\UP-98-03\SU0002230\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California Regional Water Quality Control Board <br /> Central Valley Region <br /> Robert Schneider,Chair <br /> Terry Tamminen <br /> Secretary for Sacramento Main Office Arnold zenegger <br /> Governor <br /> Environmental Internet Address: http://www.swrcb.ca.gov/rwgcb5 <br /> Protection 1 1020 Sun Center Drive#200 Rancho Cordova,CA 95670-6114 <br /> Phone(916)464-3291 <br /> ORDER NO. R5-2004-0079 <br /> ATTACHMENT C <br /> REQUIREMENTS FOR <br /> MONITORING WELL INSTALLATION WORKPLANS AND <br /> MONITORING WELL INSTALLATION REPORTS <br /> Prior to installation of groundwater monitoring wells, the Discharger shall submit a workplan <br /> containing, at a minimum, the information listed in Section 1,below. Wells may be installed after staff <br /> approve the workplan. Upon installation of the monitoring wells, the Discharger shall submit a well <br /> installation report which includes the information contained in Section 2, below. All workplans and <br /> reports must be prepared under the direction of, and signed by, a registered geologist or civil engineer <br /> licensed by the State of California. <br /> SECTION 1 - Monitoring Well Installation Workplan and <br /> Groundwater Sampling and Analysis Plan <br /> The monitoring well installation workplan shall contain the following minimum information: <br /> A. Generallnformation: <br /> Purpose of the well installation project <br /> Brief description of local geologic and hydrogeologic conditions <br /> Proposed monitoring well locations and rationale for well locations <br /> Topographic map showing facility location, roads, and surface water bodies <br /> Large scaled site map showing all existing on-site wells, proposed wells, surface drainage <br /> courses, surface water bodies, buildings, waste handling facilities, utilities, and major <br /> physical and man-made features <br /> B. Drilling Details: <br /> On-site supervision of drilling and well installation activities <br /> Description of drilling equipment and techniques <br /> Equipment decontamination procedures <br /> Soil sampling intervals (if appropriate) and logging methods <br /> C. Monitoring Well Design (in narrative and/or graphic form): <br /> Diagram of proposed well construction details <br /> - Borehole diameter <br /> - Casing and screen material, diameter, and centralizer spacing (if needed) <br /> - Type of well caps (bottom cap either screw on or secured with stainless steel screws) <br /> California Environmental Protection Agencv <br /> '� �a Recycled Paper VMW <br />
The URL can be used to link to this page
Your browser does not support the video tag.