Laserfiche WebLink
ADDITIONAL INFORMATION REQUIREMENTS 2 <br /> JESSIE'S GROVE WINERY <br /> LODI,SAN JOAQUIN COUNTY <br /> 12) Allowing for two feet of freeboard,what is the approximate storage capacity of the wastewater <br /> pond? Provide a water balance that evaluates the containment structures ability to provide <br /> sufficient capacity on a month by month basis. Include monthly evaporation,precipitation, <br /> and irrigation rates as well as monthly discharge volumes. Rainfall shall be based on the <br /> 100-year return period total annual precipitation. <br /> 13) Describe management provisions that will be implemented to prevent the occurrence of flies; <br /> mosquitoes, and odor nuisances and problems such as pond overflows (maintenance plans, <br /> standby pumps or generators, and contingency plans, etc.). <br /> 14) Describe the storage and disposal of all solid wastes generated in the winemaking process. <br /> Include a description of operation and maintenance procedures that prevent odor complaints, <br /> fly breeding, or other nuisance condition. <br /> 15) If land application of wastewater is contemplated,present loading rates for BOD (in <br /> lbs/acre/day), total nitrogen(in lbs/acre/year), and salts (in lbs/acre/year). Provide a <br /> description of the application area and the application technique. State the number of acres of <br /> land used for application and crops planned for application areas (show locations of land on <br /> map). Describe harvesting and crop application procedures. Describe the mixing ratio of <br /> wastewater and supplemental irrigation water prior to application, and describe the tailwater <br /> control and return system. <br /> 16) Before the Board can adopt WDRs for this discharge,the requirements of the California <br /> Environmental Quality Act (CEQA)must be complied with. Has the County adopted a <br /> CEQA document for this facility? If yes,provide the document. If no, the Discharger will be <br /> responsible for hiring a consultant to complete all the CEQA documents. If this is the case, <br /> the name of the consultant and the anticipated schedule for document completion shall be <br /> submitted with the Report of Waste Discharge. <br /> C tPmJai FilertSiwJuve'a GrvveBwn.113I302.doc <br />