My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002230
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
1973
>
2600 - Land Use Program
>
UP-98-03
>
SU0002230
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:07 AM
Creation date
9/9/2019 10:46:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002230
PE
2626
FACILITY_NAME
UP-98-03
STREET_NUMBER
1973
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95240
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
1973 W TURNER RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\TURNER\1973\UP-98-03\SU0002230\APPL.PDF \MIGRATIONS\T\TURNER\1973\UP-98-03\SU0002230\CDD OK.PDF \MIGRATIONS\T\TURNER\1973\UP-98-03\SU0002230\EH COND.PDF \MIGRATIONS\T\TURNER\1973\UP-98-03\SU0002230\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wastewater Treatment System �.. `-' <br /> FALL CREEK <br /> Engineering Report ENGINEERING,INC. <br /> are also subject to surge loads, due to periodic cleaning of tanks, fermenters, chillers and other <br /> large vessels. <br /> 2.2.1. Peak Process Water Flow Estimates <br /> Process wastewater flow rates at the Winery were estimated using the Napa County empirical <br /> �' formula, which estimates process wastewater flow in relation to annual wine production. Peak <br /> winery wastewater discharge (PD) in gallons per day (gpd) is found using the following formula: <br /> %W <br /> PD _ 1.5*WP <br /> 60days <br /> where WP is the annual wine production in gallons. <br /> The Winery estimates that they produce approximately 170 gallons of wine per ton of grapes <br /> processed and under the current expansion plan approximately 390 tons of grapes will be crushed <br /> annually. In the 10-year plan the crush may be increased to approximately 928 tons. Wine <br /> �. production and peak crush wastewater flow estimates for these production level estimates are <br /> shown in Table 2.2. <br /> Table 2.2. Wastewater Flow Estimates <br /> `. Crush Conversion factor Wine Maximum process <br /> (tons) (gal/ton) (gallons) wastewater(gpd) <br /> 390 170 66,300 1658 <br /> 928 170 157,760 3944 <br /> 2.2.2. Yearly Process Water Flow Estimates <br /> Due to the seasonal nature of the work at a Winery, wastewater flows vary monthly depending <br /> on the stage of production. Peak daily wastewater production occurs during the crush <br /> (September through October). Other activities throughout the year such as bottling, barrel <br /> washing, and other cleaning and maintenance activities also generate process wastewater. Table <br /> 2.3 shows the anticipated percentage of total annual wastewater expected each month at Jessie's <br /> Grove Winery. The annual flow distribution was derived from a combination of published <br /> values (Storm, 2000) and process wastewater flows measured at other Wineries in the Lodi area. <br /> Iftw <br /> .IESSIE'S GROVE WINERY MAY 2002 <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.