My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002230
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
1973
>
2600 - Land Use Program
>
UP-98-03
>
SU0002230
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:07 AM
Creation date
9/9/2019 10:46:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002230
PE
2626
FACILITY_NAME
UP-98-03
STREET_NUMBER
1973
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95240
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
1973 W TURNER RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\TURNER\1973\UP-98-03\SU0002230\APPL.PDF \MIGRATIONS\T\TURNER\1973\UP-98-03\SU0002230\CDD OK.PDF \MIGRATIONS\T\TURNER\1973\UP-98-03\SU0002230\EH COND.PDF \MIGRATIONS\T\TURNER\1973\UP-98-03\SU0002230\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wastewater Treatment System `'� +,��. FALL CREEK <br /> Engineering Report ENGINEERING,INC. <br /> 4. DESIGN CRITERIA AND CALCULATIONS— 10-YEAR PLAN <br /> The calculations performed in Section 3 were repeated to determine if the treatment system was <br /> sized adequately to process the increased crush flows projected under the 10-year plan. The <br /> wetland has been designed to remove biochemical oxygen demand (BOD) in the Winery's <br /> process wastewater by at least 95% based on design flows of 3,940 gallons per day, organic <br /> %W process <br /> of 164 lbs/day, and a surface loading rate of 745 lbs BOD/ac-day. The system will <br /> %W remain unchanged from its configuration in the current flow regime. <br /> \r <br /> All of the water balance and surface loading rate calculations described in Section 3 were <br /> Performed again to analyze the system under the projected 10- ear flows. Nothing changed in <br /> �► the calculations except the flow rates of both the process water and the stormwater. FCE <br /> performed this second set of water balance and surface loading rate calculations to assess the <br /> performance of the waland treatment system under future flow conditions. <br /> 4.1. Septic Tank <br /> The 5,000-gallon installed previously, will be used in the 10-year plan to settle screened <br /> wastewater. Table 4.1 shows the expected detention times in the septic tank for projected <br /> �' monthly flows under the 10-year plan. During the months of crush (August through November) <br /> %W detention times range from 1.5 to 3 days. In the summer months, detention time is longer <br /> because little process and storm water enter the system. Occasionally during the winter <br /> detention time could be as little as one and a half day due to stormwater entering the system. <br /> Table 4.1 Septic Tank Detention Times <br /> Septic Detention <br /> Month Inflow Time <br /> (gpd) day <br /> January 3,844 1.8 <br /> February 4,433 1.6 <br /> tom, March 3,255 2.2 <br /> ` April 1,795 3.9 <br /> May 1,007 7.0 <br /> .- June 494 14.2 <br /> _ July 429 16.3 <br /> August 2,375 2.9 <br /> �- September 4,212 1.7 <br /> _ October 4,456 1.6 <br /> November 3,625 1.9 <br /> December 4.160 1.7 <br /> 4.2. Water Balance Calculations <br /> Average and wet rainfall years were modeled to assess the capacity of the proposed wetland/land <br /> %W disposal system to manage wastewater and stormwater discharged from the winery utilizing <br /> calculated wastewater flow data. <br /> JESSIE'S GROVE WINERY MAY 2002 <br /> 16 <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.