My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002230
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
1973
>
2600 - Land Use Program
>
UP-98-03
>
SU0002230
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:07 AM
Creation date
9/9/2019 10:46:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002230
PE
2626
FACILITY_NAME
UP-98-03
STREET_NUMBER
1973
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95240
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
1973 W TURNER RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\TURNER\1973\UP-98-03\SU0002230\APPL.PDF \MIGRATIONS\T\TURNER\1973\UP-98-03\SU0002230\CDD OK.PDF \MIGRATIONS\T\TURNER\1973\UP-98-03\SU0002230\EH COND.PDF \MIGRATIONS\T\TURNER\1973\UP-98-03\SU0002230\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r. <br /> Wastewater Treatment System 1%0,W -+0l' <br /> FALL CREEK <br /> `�- Engineering Report ENGINEERING,INC. <br /> To confirm the treatment efficiency, FCE calculated the expected removal efficiency for the <br /> proposed wetland. A first order equation was used to model pollution removal, assuming that <br /> the peak wetland influent BOD is 4,000 mg/L (20% of 5,000 mg/L BOD removed in the septic <br /> .. tank), t is assumed to be 10 days, and KT is 0.69 d-1. Therefore the effluent BOD concentration <br /> is: <br /> C, = C e-"" = 4000e-(0.69.10) = 4mg/L . <br /> This shows that a 10-day detention time will theoretically produce a BOD reduction of over <br /> 99%. <br /> 4.5. Stormwater Storage Capacity <br /> %W The wetland has been designed with a one foot berm around the entire perimeter. The inlet will <br /> be gravity flow from the septic tank. And the effluent will be to a pump basin. The wetland will <br /> also have an overflow on the outlet side to an existing stormwater detention area. The wetland <br /> will have a freeboard volume of approximately 48,000 gallons and the invert of the overflow will <br /> be set 8.0" above the top of the wetland. The existing stormwater detention area will be <br /> reshaped to provide and additional 71,000 gallons of storage. The system will provide a total <br /> stormwater storage volume of 119,000 gallons. <br /> `" To determine whether this freeboard would be adequate to contain rainfall and stormwater runoff <br /> %W from the 100-year, 24-hour storm, a simple water balance was performed. According to <br /> %W NOAA's Precipitation-Frequency Atlas of California, the depth of water in the 100-Yr 24-hr <br /> storm is 3.8 inches. This number was used to calculate the stormwater runoff at the winery <br /> %W facility. <br /> �- V, = A*d*C, = 56,000sf*3.8in*(lz n)*0.88 = 15,600cf = 116,700gallons. <br /> This calculation shows that the 100-year, 24-hour storm (116,700 gallons) would be contained <br /> by the stormwater facilities (119,000 gallons). <br /> v <br /> ,%W <br /> %W <br /> JESSIE'S GROVE WINERY MAY 2002 <br /> �- 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.