Laserfiche WebLink
%W <br /> .. <br /> EK <br /> REPORT OF WASTE DISCHARGE ENGINEERING,INC. <br /> 1. INTRODUCTION <br /> `' Jessie's Grove Winery (Spenker Ranch, Inc.), located at 1973 W. Turner Rd, in Lodi, California <br /> `, (APN#013-050-17), is a wine producing facility and vineyard. The family has owned the <br /> property since 1872. The Winery is situated on a 320-acre parcel, which has vineyards,pasture, <br /> an oak grove, and a residence in addition to the winery. The facility includes an office, several <br /> outbuildings (sheds and garages), a tasting room, and outdoor wine storage. The property is <br /> �► located in a primarily agricultural area within the San Joaquin River drainage basin and has <br /> `,, virtually flat topography. The nearest residence off the property is three eighths of a mile away <br /> from the Winery. A vicinity map is shown in Figure 1.1; Figure 1.2 shows the winery property <br /> and layout; and Figure 1.3 shows the existing facility and wastewater systems. <br /> Under the current expansion plan, the winery anticipates crushing approximately 390 tons of <br /> grapes annually producing approximately 66,300 gallons of wine, which will be divided into <br /> bulk wine and approximately 5000 cases of Jessie's Grove Wine. The Winery anticipates no <br /> �' production increase above this level in the next five years. However, in the following 5 years <br /> �. they could increase production as much as 538 tons, for a total annual crush of 928 tons (158,000 <br /> gallons). Water for domestic, agricultural, and winery processes is supplied by wells located on <br /> the property. Sanitary and process wastewater is disposed of in separate on-site systems. <br /> '�► In 2002, the California Regional Water Quality Control Board required that the Winery submit a <br /> `, Report of Waste Discharge, including a technical report. In response to this requirement, the <br /> `. Winery has retained Fall Creek Engineering(FCE) to evaluate the existing process wastewater <br /> system, identify and design proposed improvements, and prepare a technical report to address the <br /> %' concerns of the Report of Waste Discharge. <br /> `, After evaluating the existing system, FCE completed a technical report and is preparing <br /> engineering design plans to improve the existing process wastewater disposal system at the <br /> �' Winery. The proposed improvements include: <br /> •W <br /> r,. (1) Installing a pretreatment system consisting of a hyperbolic screen to separate wastewater <br /> solids from the liquids; <br /> (2) Installing a treatment system which will include a 5,000 gallon septic tank followed by a <br /> �k. 0.22 acre sub-surface flow shallow wetland; <br /> `. (3) Installing a pump basin and pumping system to reuse treated effluent to irrigate a grass <br /> field; and <br /> `. <br /> `, (4) Installing a solid set sprinkler system to irrigate 0.6 acres of pasture. <br /> �w <br /> `. <br /> %W <br /> JESSIE's GROVE WINERY 1 FEBRUARY 2004 <br />