Laserfiche WebLink
Pp.0 IN <br /> :z THOMAS M. <br /> COUNTY OF SAN JOAQUIN <br /> DEPUTY DIRECTOR <br /> DEPARTMENT OF PUBLIC WORKS <br /> P.O.BOX 1810-1810 E.HAZELTON AVENUE MANUEL SOLORIO <br /> STOCKTON,CALIFORNIA 95201 INTERIM DEPUTY DIRECTOR <br /> (209)468-3000 <br /> LER <br /> THOMAS R. FLINN FAX(209)468-2999 STEVEN WINKDEPUTY DIRECTOR <br /> DIRECTOR <br /> FRED PAYTON <br /> BUSINESS ADMINISTRATOR <br /> April 16, 2002 E�NE-C,EIVED <br /> APR 17 2002 <br /> MEMORANDUMn <br /> Community <br /> TO: Kerry Sullivan, Deputy Director <br /> Community Development Department <br /> CONTACT PERSON: Jennifer Jolley <br /> GK <br /> FROM: Gabriel Karam, Senior Civil Engineer <br /> Public Services Division <br /> SUBJECT: PA-0200114 A SITE APPROVAL APPLICATION TO CONVERT AN <br /> EXISTING WINERY INTO A LARGE WINERY BY ADDING 55 WINE <br /> STORAGE AND FERMENTING TANKS IN THREE PHASES, LOCATED <br /> ON THE NORTH SIDE OF TURNER ROAD AT THE NORTHWEST <br /> CORNER OF DAVIS ROAD. (SUPERVISORIAL DISTRICT 4) <br /> PROPERTY OWNER: Nick Sikeotis/Greg Burns APPLICANT: Spenker Ranch, Inc. <br /> ADDRESS: 1973 W. Turner Road APN: 013-050-17 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated <br /> Flood Hazard Area. <br /> Turner Road has an existing right-of-way width of 40 feet and a planned right-of-way width of <br /> 84 feet. <br /> RECOMMENDATIONS: <br /> 1. An encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2. The driveway approach shall be improved in accordance with the requirements of <br /> San Joaquin County Standards R-17 prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> 3. The owner shall execute an Irrevocable Offer and Agreement to Dedicate Road to result in <br /> in a Forty-Two (42) foot wide right-of-way from the centerline of Turner Road to the <br /> property line across the parcel's frontage. <br /> (A $280.00 fee currently is required for processing per Development Title Table 9-240.2 <br /> in addition to a copy of the Grant Deed and a legal description of the parcel to be offered <br /> for dedication.) (The fee due will be based on the current fee schedule.) <br /> (Development Title Section 9-1150.5) <br />