My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002255
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
4614
>
2600 - Land Use Program
>
UP-97-01
>
SU0002255
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:08 AM
Creation date
9/9/2019 10:47:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002255
PE
2626
FACILITY_NAME
UP-97-01
STREET_NUMBER
4614
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
Zip
95240
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
4614 W TURNER RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\TURNER\4614\UP-97-01\SU0002255\APPL.PDF \MIGRATIONS\T\TURNER\4614\UP-97-01\SU0002255\CDD OK.PDF \MIGRATIONS\T\TURNER\4614\UP-97-01\SU0002255\EH COND.PDF \MIGRATIONS\T\TURNER\4614\UP-97-01\SU0002255\CORRESPOND.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUARTERLY MONITORING REPORT <br /> FOURTH QUARTER OF 2009 <br /> TURNER ROAD VINTNERS <br /> Lodi, California <br /> WKA No. 5279.03 <br /> January 22, 2010 <br /> 1.0 INTRODUCTION <br /> This Quarterly Monitoring Report presents the results of fourth quarter 2009 groundwater <br /> sampling and analysis for Turner Road Vintners, LLC Winery as required by the California <br /> Water Quality Control Board - Central Valley Region (RWQCB) (Figure 1). The work was <br /> completed in accordance with Monitoring and Reporting Program(MRP)No. 99-103 requirements <br /> issued by RWQCB dated July 28, 1999. <br /> 2.0 PURPOSE AND SCOPE <br /> The purpose of the groundwater-monitoring activities was to evaluate the groundwater <br /> conditions in the vicinity of the wastewater treatment and land application areas operated by the <br /> Winery (Figure 2). As required by MRP No. 99-103, the following presents the work steps <br /> conducted during groundwater monitoring activities: <br /> • Measure depth-to-groundwater (DTW) and calculate groundwater elevation <br /> • Purge wells <br /> • Collect groundwater samples <br /> • Submit samples for analyses <br /> • Prepare report <br /> 3.0 SITE DESCRIPTION <br /> The Turner Road Vintners' facility is divided between two separate locations that are identified <br /> herein as the West Facility (5852 West Turner Road) and the East Facility (4614 West Turner <br /> Road) (Figures 1 and 2). The West Facility houses wine production and the wastewater <br /> treatment system. Administration activities and warehouse/storage are located on the East <br /> Facility. The facilities are approximately 3,300 feet apart (Figure 2). <br />
The URL can be used to link to this page
Your browser does not support the video tag.