Laserfiche WebLink
i <br /> Analysis <br /> Background <br /> On September 18, 1997, the Planning Commission approved Use Permit No. UP-97-5 for a new winery <br /> with a 960 square foot office, 6,480 square foot warehouse, 5,940 square foot canopy, 2,400 square foot <br /> storage building, 15,264,000-gallon tank farm, a truck scale, and twelve presses. An existing industrial <br /> waste water processing system was improved and a wetland area was created on the northern half of the <br /> parcel. No wine tasting facilities were proposed and the facility was not open to the public. <br /> On February 19, 2004, the Planning Commission approved PA-0300672 to expand the existing winery in <br /> two phases over a five year period. The improvements included a 3,880 square foot addition to an <br /> existing 2,400 square foot storage building, the addition of eight new tanks which provides for the storage <br /> of an additional 4,384,000 gallons of wine (for a total of 19,648,000 gallons), and two new presses for <br /> crushing grapes (for a total of 14 presses). <br /> The winery currently operates 5 days per week (Monday through Friday) during the hours of 7:00 a.m. and <br /> 4:00 p.m. and employs a total of 20 workers. The number of employees will increase by two when the <br /> project is completed. There is no wine tasting proposed for the expansion, and the facility will remain <br /> closed to the public. <br /> Parkin <br /> Development Title Table 9-1015.3(a) states for the Wineries and Wine Cellars use type that 2.5 parking <br /> spaces shall be provided for each 1,000 square feet of building. The applicant has proposed to expand <br /> the current operation of building square footage by 36,680 square feet. This would require that 92 <br /> additional parking spaces be provided for the project, including two accessible spaces, one of which shall <br /> be van accessible. 7 However, Development Title Section 9-1015.9 permits the modification of these <br /> requirements by the Director in cases, which due to the unusual nature of the establishment proposed or <br /> the development proposal submitted for it, the requirements may be considered insufficient or excessive. <br /> The applicant submitted a letter dated February 25, 2009 requesting a reduction in the number of parking <br /> spaces to 10 parking spaces because the additional tanks and additional buildings are used for storage <br /> and the number of employees will increase by two when the project is completed. The Community <br /> Development Department has reviewed the request and has determined that a reduction in the number of <br /> parking spaces to 10 is sufficient for the proposed use. At full buildout, sixty-seven (67) parking spaces <br /> are required. PA-0300672 and UP-97-5 required a total of fifty-seven (57) parking spaces. There are <br /> currently eighty-eight (88) parking spaces provided, including two (2) accessible spaces (one of which is <br /> van accessible), which exceeds the minimum number of required parking spaces. <br /> Neighborhood Reseonse <br /> The Community Development Department has received one letter of concern from a neighbor requesting <br /> the addition of a right turn lane and a left turn lane to be constructed on Turner Road. The Department of <br /> Public Works reviewed the request and concluded the lane addition was not warranted because the <br /> proposed expansion will consolidate the current operations onto the subject property and will therefore <br /> result in a decrease in traffic. <br /> San Joaquin CountyPA-0900009\Constellation Wines US <br /> Community Development Page 3 <br />