Laserfiche WebLink
S J C O G, Inc. <br /> 555 Fast Weber Avenue . Stockton,CA 95702 • (209)235-0600 • FAX(209)235-0438 <br /> San Joaquin County Multi-Species Habitat Conservation&Open Space Plan (SJMSCP) <br /> SJMSCP RESPONSE TO LOCAL JURISDICTION(RTLJ) <br /> 0 ADVISORY AGENCY NOTICE TO SJCOG,Inc. <br /> To: Stephanie Stowers,San Joaquin County Community Development Department <br /> From: Laurel Boyd,SJCOG,Inc. <br /> Date: July 25,2013 <br /> Local Jurisdiction Project Title: WA <br /> Assessor Parcel Number(s): 025-110-13 <br /> Local Jurisdiction Project Number: PA-1300116(MS) <br /> Total Acres to be converted from Open Space Use: 40 acres <br /> Habitat Types to be Disturbed: Agricultural Habitat Land <br /> Species Impact Findings: Findings to be determined by SJMSCP biologist. <br /> Dear Ms. Stowers: <br /> SJCOG, Inc. has reviewed the application for PA-1300116 (MS). This includes a Minor Subdivision application to <br /> subdivide an existing forty acre parcel into one ten-acre parcel and a thirty-acre designated remainder parcel. The <br /> parcels are being created under Development Title Section 9-610.3(e)- Parcels For Dwellings on Same Lot. The project <br /> site is located on the south side of Turner Road, 350 feet east of Thornton Road, west of Lodi (APN/Address: 025-110- <br /> 12; 6454 W. Turner Road, Lodi). <br /> San Joaquin County is a signatory to San Joaquin County Multi-Species Habitat Conservation and Open Space Plan <br /> (SJMSCP). Participation in the SJMSCP satisfies requirements of both the state and federal endangered species acts, <br /> and ensures that the impacts are mitigated below a level of significance in compliance with the Califomia Environmental <br /> Quality Act (CEQA). The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate Incidental Take <br /> Minimization Measure are properly implemented and monitored and that appropriate fees are paid in compliance with the <br /> SJMSCP. Although participation in the SJMSCP is voluntary, Local Jurisdiction/Lead Agencies should be aware that if <br /> project applicants choose against participating in the SJMSCP, they will be required to provide alternative mitigation in an <br /> amount and kind equal to that provided in the SJMSCP. <br /> At this time the applicant is requesting a Minor Subdivision with no ground disturbance. Any future <br /> structures that require ground disturbance on this or subsequent divided parcels will be subject to <br /> participate in the SJMSCP and should be resubmitted to this agency. Current or future owners of <br /> this—or subdivided properties should be made aware of the conditions that are placed by the SJMSCP <br /> on future development on the created parcels. <br /> This project is subject to the SJMSCP and is located within the unmapped land use area. Per requirements of the <br /> SJMSCP, unmapped projects are subject to case-by-rase review. This can be a 90 day process and it is recommended <br /> that the project applicant contact SJMSCP staff as early as possible. It is also recommended that the project applicant <br /> obtain an information package. http://www.sjcog.org <br /> After this project is approved by the Habitat Technical Advisory Committee and the SJCOG Inc. Board, the following <br /> process must occur to participate in the SJMSCP: <br /> • Schedule a SJMSCP Biologist to perform a pre-construction survey prior to any ground disturbance <br /> • SJMSCP Incidental take Minimization Measures and mitigation requirement: <br /> 1. Incidental Take Minimization Measures(ITMMg)will be issued to the project and must be signed by the project applicant prior to any <br /> ground disturbance but no later than six(6)months from receipt of the ITMMs. If ITMMs aro not signed within six months,the applicant <br /> most reapply for SJMSCP Coverage. Upon receipt of signed ITMMs from project applicant,SJCOG,Inc.staff will sign the ITMMs. This <br /> is the effective date of the ITMMs. <br /> 2. Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs. <br /> 3. Upon issuance of fully executed ITMMs and prior to any ground disturbance,the project applicant must: <br />