Laserfiche WebLink
Elm Street <br /> BA V M BAC H & PIAZZA, INC.lo <br /> Lodi CA.95240--2003 <br /> CIVIL ENGINEERS • LAND SURVEYORS Phone (209) 368.6618 <br /> Fax (209) 368-6610 <br /> www.bpengineers.net <br /> Parcel 4 <br /> All of Lots 3, 131 14, 15, 19, 20 and 29 as said Lots are designated upon that certain <br /> Map entitled, WHITAKER TRACT, filed for record May 13, 1904, in Book 3 of Maps and <br /> Plats, at Page 22, San Joaquin County Records. <br /> EXCEPTING a strip of land 15 feet in width along the entire east line of said Lots 3, 14 and <br /> 19, as reserved for roadway according to the Map filed in the County Recorder's Office in <br /> and for San Joaquin County. <br /> ALSO EXCEPTING a strip of land 20 feet in width along the entire west line of said Lots 13, <br /> 20 and 29 as reserved for roadway. <br /> ALSO EXCEPT THEREFROM the East 193.00 feet of the North 10.00 feet of said Lot 19. <br /> ALSO EXCEPT THEREFROM the East 193.00 feet of the South 223.00 feet of said Lot 14. <br /> ALSO EXCEPT THEREFROM the North 365.00 feet of said Lot 13. <br /> ALSO EXCEPT THEREFROM the West 355.00 feet of said Lot 20. <br /> ALSO EXCEPT THEREFROM the North 111.05 feet of the West 355.00 feet of said Lot 29. <br /> ALSO EXCEPT THEREFROM the South 23.00 feet of the West 355.00 feet of said Lot 13. <br /> ALSO EXCEPT THEREFROM that portion of said Lot 29 described as follows: <br /> BEGINNING at the Southeast corner of said Lot 29, being also a point in the center line of <br /> Turner Road; thence Northerly along the East line of said Lot 29, a distance of 290.40 <br /> feet to a point; thence Westerly, parallel with the South line of said Lot 29, a distance of <br /> 450.00 feet to a point; thence Southerly parallel with the East line of said Lot 29, a <br /> distance of 290.40 feet to a point in the South line of said Lot 29, being also the center <br /> line of said Turner Road; thence Easterly along the South line of said Lot 29, a distance <br /> of 450.00 feet to the POINT OF BEGINNING. <br /> 5:\Projects\2018\18014\1_Documents\doc\Lot Line Adjustment.docx <br />