Laserfiche WebLink
May 04 06 09:47a Community Development 7 099417270 p.17 <br /> L) U <br /> 0 • w <br /> I <br /> Q.l ensure that a responsible employee conducts an inspection of all of the wastewater and runoff convey- Yes No <br /> antes(see Checklist Item#3). <br /> This wekly inspection will help identify structural problems,leaks,or other evidence that the convey- <br /> 'Dnces may fail and discharge wastewater or rainfall runoff from the production area. <br /> iD COn- <br /> 5 lhave at feast one depth marker on lagoons,holding ponds,or ether wastewater storage structures <br /> associated with my production area to indicate design volume and minirrrttm capacity necessary <br /> e h��event <br /> Iain the design rainfall event including freeboard.The design rainfall our event for facilities constructed <br /> for facilities constructed before April 14,2003 and a 100-year, Yes No <br /> after April 14,2003. <br /> it easy to determine if liquid levels in these impoundments are within regulatory <br /> Depth markers makethe"nimun,treatment volu no in <br /> limits.Reasons to monitor depth markers real ht inc tepee ty for the next judo precipitation event or ensuring ng that <br /> an anaerobic lagoon,ensuring adequateot overtop an carthen _ OR the ins ER11- <br /> an ongoing rainfall event does see CAFO Ff1G Sheet#15:Liquid Level Marlk:ers forinformation <br /> Manure <br /> anion and use of depth <br /> Starnges and Lagoons. <br /> 6.I ensure that a responsible employee inspects all of the depth markers at least once a week. Yes No <br /> n,available <br /> minimu a reg sirels, and not Eyikey employees,LS <br /> not a substitute automate <br /> Weeky inspections are the for this <br /> depth measurements,operate emerg acy g <br /> weekly visual inspection. No <br /> 7.I ensure that a responsible employee inspects all wastewater holding ponds,lagoons,and other re- Yes <br /> tention structures at least once a week. <br /> S.t ensure that a responsible employee inspects all water lines in the production areas at least daily. es Yes No <br /> aks in these water <br /> This inspection includes ier <br /> con eyances and the reretention strut ures that w <br /> wastewater t e not designed to re- <br /> ceive, <br /> an extra load on wast <br /> convey,and store this normally uncontaminated water. <br /> ed in an ac:duction area and are <br /> isPOs <br /> 9.Animal mortalities are removed in wat wa epromptimpoundmentsly fi-otn the o,other liquid manure stor storage facilties-optable No <br /> way.They are NOT p Yes <br /> process wastewater systems(unless designed specifically to treat mortalities). <br /> Proper mortality disposal is vitally important both to protect water quality and to preserve good <br /> community and neighbor relations. <br /> 10.I respond quickly to any deficiencies noted in any of the daily and weekly inspections of the pro- <br /> 10. <br /> duction area,water lines,and wastewater inspoundments and cony Yes Noval <br /> es 7nust he <br /> The federal rules do not sp specify a nixed Deficient os intaniy of these Lime inter syn which stems represent anQncreased risk <br /> rule's standard is"as soon as Po <br /> of illegal discharge and should have a high priority relative to other CAFO activities or responsibi cites. <br />