Laserfiche WebLink
Kerry Sullivan, Deputy Director -2- <br /> Community Development Department <br /> MS-01-18 <br /> 3. (Irrevocable Offer of)Dedication to result in a 30-foot wide right-of-way from the centerline of <br /> Union Road to the property line is required across the frontage of the proposed Parcel 1 of <br /> APN: 204-030-01. The Irrevocable Offer of Dedication shall be made on the Parcel Map. <br /> (Development Title Section 9-1150.5(b)) <br /> 4. All easements of record shall be shown on the Parcel Map. <br /> (Development Title Section 9-910,20) <br /> 5. Drainage from Parcel 1 shall be retained on-site by a retention basin(18-inch maximum depth) <br /> and shall be noticed by a statement on the Parcel Map. The volume of on-site drainage required <br /> shall be specified for each parcel on the Parcel Map. <br /> (Development Title Section 9-113 5.9) <br /> BEN: <br /> P:100MMENfSW Wr 20021M"1.18.wpd <br /> I <br />