My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006059
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
12100
>
2600 - Land Use Program
>
PA-0600207
>
SU0006059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:32:04 AM
Creation date
9/9/2019 10:54:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006059
PE
2627
FACILITY_NAME
PA-0600207
STREET_NUMBER
12100
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
24014024
ENTERED_DATE
5/23/2006 12:00:00 AM
SITE_LOCATION
12100 W VALPICO RD
RECEIVED_DATE
5/23/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\V\VALPICO\12100\PA-0600207\SU0006059\APPL.PDF \MIGRATIONS\V\VALPICO\12100\PA-0600207\SU0006059\CDD OK.PDF \MIGRATIONS\V\VALPICO\12100\PA-0600207\SU0006059\EH COND.PDF \MIGRATIONS\V\VALPICO\12100\PA-0600207\SU0006059\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Architectural Narrative: <br /> Phase One <br /> The design and construction of the multipurpose building at St. Bernard's Catholic <br /> Church begins the process for the new church campus to be recognized. This project <br /> is the first phase of a complete master plan for the site. The 22,000 square foot <br /> building is oriented fronting the future plaza,and parking for approximately 300 cars is <br /> provided during this phase of work. The site design minimi es the amount of future <br /> demolition site work,while still providing convenient site and building access. <br /> The design of the multipurpose building is consistent with the master plan's colors <br /> and materials,but is designed in a more austere and unembellished style. This design <br /> strategy will allow for a more economical building so that phase one can be completed <br /> promptly, and so that the future church will be more prominent on the site. The <br /> orientation and design also accommodates future support space additions (phase 5). <br /> The initial purpose of the building is for worship until the main church is built. A <br /> space of approximately 10,800 square feet will hold up to 900 people seated for mass. <br /> The space can also be used for large gatherings and banquets,which is served by <br /> the adjacent kitchen. Sized for catering initially,it can be expanded into the adjacent <br /> storage space when needed. The building is also designed to be used as a gym which <br /> will be especially useful when the school (phase 6 & 7) is built. <br /> The design team strives to design a building that responds to the needs of its users, <br /> one that will serve the parishioners and the surrounding community.The first phase <br /> of the master plan,the multipurpose building,produces a foundation for St. Bernard's <br /> parish and the future growth in the master plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.