Laserfiche WebLink
Building Area <br /> Phase Two, Three & Four: Area Summary <br /> Qty Area SF Total Area <br /> Church: Phase Two <br /> Worship Space 1 32,445 36,506 <br /> Gathering 1 8,965 8,965 <br /> Baptistry 1 1,200 1,200 <br /> Shrine Reconciliation 4 200 1 800 <br /> Choir Area 1 1,750 1,750 <br /> a Other 10,000 10,000 <br /> Covered walkway 4,548* <br /> �- Phase Two Subtotal 49,700 SF <br /> Church Support Space: Phase Three <br /> I Classrooms 6 1,200 7,200 <br /> Music 1 1,200 1,200 <br /> Mechanical 2677* <br /> 6 Other 8,030 8,030 <br /> Phase Three Subtotal 18,230 SF <br /> 1 Church Support Space: Phase Four <br /> Future Expansion 8,109 8,109 <br /> Administration 1,586 1,586 <br /> Mechanical 2678* <br /> Other 1,789 1,789 <br /> Phase Four Subtotal 14,162 SF <br /> F Total Gross Area 82, 092 GSF <br /> * 50% of actual area <br />