My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006059 SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VALPICO
>
12100
>
2600 - Land Use Program
>
PA-0600207
>
SU0006059 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:32:04 AM
Creation date
9/9/2019 10:54:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0006059
PE
2627
FACILITY_NAME
PA-0600207
STREET_NUMBER
12100
Direction
W
STREET_NAME
VALPICO
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
24014024
ENTERED_DATE
5/23/2006 12:00:00 AM
SITE_LOCATION
12100 W VALPICO RD
RECEIVED_DATE
5/23/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\V\VALPICO\12100\PA-0600207\SU0006059\NL STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FrEvapotranspiration <br /> n capabilities of the indigenous clayey surface soils and the fine-grained subsurface <br /> cted to increase and substantiate the denitrification potential. Ammonium retention <br /> ils should also be significant, as has been observed in other projects with similar soils. <br /> iration has not been factored in any of the three nitrate loading methods; however, it <br /> ificant part of wastewater management and consequently nitrate-nitrogen loading. <br /> Hantzsche/Pinnemore Equation <br /> IN(1 - d) +RNh <br /> Nr= (I+R) <br /> Where: <br /> Nr= Resultant average concentration of nitrate-nitrogen in recharge water-ppm NO3-N. <br /> I = Volume rate of wastewater entering the soil averaged over the gross developed area in <br /> inches per yr. Total wastewater volume: 2,475 gpd x 365 days/year=903,375 gals+7.47 <br /> gals per ft' = 120,772 cu ft of wastewater. <br /> Does not account for Evapotranspiration. <br /> Nw= Total nitrogen concentration of wastewater at 87 mg N/L based on average of three effluent samples. <br /> Does not account for loss of nitrogen in septic tanks (15%+) or through biomat(10%+). <br /> d = Fraction (%) of nitrate-nitrogen loss due to denitrification in the soil <br /> R = Average recharge rate of rainfall - inches per yr <br /> Nb= Background nitrate-nitrogen concentration of rainfall recharge, exclusive of wastewater <br /> influences (ppm NO3-N) <br /> Values and Assi=tions <br /> I= 903.375 eals =total WW/Yr= 120.772 cu ft/vr= 1.66 in/yr <br /> 20 Ac x 43,560 sq ft/Ac x (1 ft/12 in) <br /> Nw= 87 mg N/L <br /> d = Assume 25% due to a fine-grained silt and clay soil at soil/effluent interface. <br /> R = 13.2 in/yr. <br /> Nb= Assumed to be 0.1 ppm N0;N <br /> 1.66 in/,g(87 mg N/L) (1 - 0.25) + (13.2 in/yr x 0.1 me/L) <br /> Nr = (1.66 in/yr+ 13.2 in/yr) <br /> Nr = 7.4 ppm as nitrate-nitrogen (NO3-N) or 32.9 ppm as nitrate (NO3) <br /> Nr under the Maximum Contaminant Level(MCL) for nitrate-nitrogen at 10 ppm. <br /> LL�_ <br /> Page-17 �Ji <br /> - <br /> Chesney Consulting <br />
The URL can be used to link to this page
Your browser does not support the video tag.