Laserfiche WebLink
• o PLAN MAP AMENDMENT <br /> q SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> FILE NUMBER: - - <br /> ENVIRONMENTAL INFORMATION(Continued) <br /> Water,Drainage and Flooding <br /> Describe any areas subject to flooding(include flood depths and flood panel map number). Designated as X:Area to be <br /> determined to be outside the 0.2%chance (500yr) flooding (06077C0730F)- <br /> Describe the current depth of the groundwater and depth to potable water: Current groundwater depth is 30-60 feet. <br /> Equal elevation of groundwater (Spring 2010 Ground Water Report) listed depth of approx, 40 feet- <br /> Describe any existing drainage courses or eroded areas on or near the project site(e-g-rivers,creeks,swales or drainage ditches): <br /> The property is bounded by the north by a canal owned by the West Side Irrigation District. <br /> Land,Land Use and Blota <br /> Describe the site's topography(e.g.land forms,slopes,etc.): The land slopes from 0 to 2%toward the north side of the property. <br /> Cross slope(east-west)is negligible. <br /> Describe agricultural land that will be lost as a result of the project(type of crops,acres,quality of soil,etc.): <br /> Row and field crops.The property is 20 acres of farmable land. The soil is clay loam. Since irrigation water supply <br /> is subject to federal allocation,there is no guarantee of an adequate supply of irrigation water, <br /> Describe any wildlife habitat on-site and species that are or may be present:None <br /> i <br /> I <br /> Describe any vegetation on-site by type and extent: Fallow field I <br /> i <br /> Traffic and Transportation <br /> Describe the amount and type of traffic that will be generated by the project: <br /> Light traffic due to Cemetery's expected 15 burials a month. <br /> Air Quality <br /> Describe air pollutants that may result from the project(e.g.construction related dust,vehicle trips per day,fire places,incinerators, <br /> etc-): <br /> Cemetery is expected to have approximately 15 burials a month. Each burial requires 1-1 112 his.of backhoe and small tractor <br /> i <br /> F:IDEVSMPlanning Applicadon Forms% Page 6 of 7 <br /> Plan Application Amendment.doo.(Revised 05.11-09 <br /> I <br />