Laserfiche WebLink
OP4 VI N'.C <br /> > A° COUNTY OF SAN JOAQUIN THOMAS R.FLINN <br /> r.' 2 <br /> DEPARTMENT OF PUBLIC WORKS DEPUTY DIRECTOR <br /> P.O.BOX 1810-1810 E.HAZELTON AVENUE <br /> • �4<�FGA�`P STOCKTON,CALIFORNIA 95201 THOMAS M.GAU <br /> (209)468-3000 DEPUTY DIRECTOR <br /> MANUEL LOPEZ FAX(209)468-2999 <br /> DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> March 7, 2001 <br /> MEMORANDUM RECEIVEL7 <br /> TO: Kerry Sullivan, Deputy Director MAR 7 2001 <br /> Community Development Department <br /> CONTACT PERSON: Jennifer Jolley Community Development Dept. <br /> r.w <br /> FROM: Gabriel Karam, Senior Civil Engineer <br /> Public Services Division <br /> SUBJECT: SA-01-19 A USE PERMIT APPLICATION FOR A 3,500-SQUARE-FOOT <br /> UNMANNED FIRE STATION THAT WILL HOUSE THREE FIRE TRUCKS, <br /> LOCATED ON THE NORTH SIDE OF HIGHWAY 120 APPROXIMATELY <br /> 1,200 FEET EAST OF VAN ALLEN ROAD. (DISTRICT 5). <br /> APPLICANT: Escalon Unified School District APN: 205-250-14 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood <br /> Hazard Area. <br /> RECOMMENDATIONS: <br /> 1. A Caltrans Encroachment permit shall be required for work within the right-of-way of State <br /> Route 120. (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2. The driveway approach shall be improved in accordance with the requirements of Caltrans <br /> Standards. (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee may be required for this development. The fee is due and <br /> payable at the time of building permit application. (The fee currently is $157.45 per trip-end. <br /> The fee shall be automatically adjusted July 1 of each year by the Engineering Construction <br /> Cost Index as published by the Engineering News Record. A credit may be allowed if it can be <br /> verified that the existing development on this site was in operation on or after April 23, 1990.) <br /> (Resolutions R-90-304, R-91-1025,R-93-167, R-94-179,R-95-650 and R-96-592) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 5. Verification shall be obtained from the Solid Waste Division(468-3066)that this development <br /> has addressed the items on the attached Waste Plan Format for Development Projects. Final Site <br /> Plan is required upon submittal of verification. <br /> GK:DM:tee <br /> PS-1CO28-EIF <br />